Triage — collision edge added, ready → blocked, 2026-08-20. No spec, task,
acceptance criterion or estimate changed, and the narrowed scope from finding 2 is
untouched. This is an…
Triage — this merge turns on an issue-side engine the spec never mentioned, 2026-08-20. Body updated in four places; no spec decision reversed, no task added for the builder, no label or…
Triage — the 2026-08-19 ruling was never folded into this body, 2026-08-20. No checkbox state changed, and no new work is owed: everything added here is either already in !31 or already…
Triage — Dependencies line corrected, 2026-08-20. No spec, task, criteria, or label change.
This issue's Dependencies said "#32 (release 1.4.0) names this issue as a risk to its own asset…
Triage — one stale label claim in the body, and one missing post-merge criterion, 2026-08-20.
Zero forge events since my last writes and every label on the board is true, so this tick…
Triage sweep: no label change — blocked is still true and still the least-wrong of the three flow labels here (ready would claim a builder can pick this up and succeed, which is false: it is…
Triage — Dependencies repointed, 2026-08-20.
Same defect as the one repaired on #23 this tick, in this epic's live pointer: Dependencies read "ceremony#200 is where the diverged-tree…
Triage — cross-repo pointer repaired, 2026-08-20.
This issue told a builder four times that the diverged-tree procedure "lives in" / "is owned by" ceremony#200. Measured this tick:…
Triage — epic status surfaces corrected, 2026-08-20.
This epic contradicted itself. Its prose says plainly, under What this epic does not do, that #1'''s and #23'''s bodies **were revised…
Triage correction, 2026-08-20 — a post-merge criterion had gone unexecutable.
This issue's post-merge criterion 2 and its matching test-plan bullet both named !29 as the PR whose panel…
Triage sweep, 2026-08-20 — epic refreshed, children brought to contract. The task list here was already accurate; the Context paragraph was not, so it now records that #26 merged as !29 and…
Triage: brought up to contract, 2026-08-20. This issue was executable but was missing the sections a reviewer needs — it had no Tasks, no checkboxed acceptance criteria (which become the…
Triage: brought up to contract, 2026-08-20. The "Proposed fix" above listed three items, one of them explicitly optional — an issue whose spec still lists options is not ready, whatever…
Triage normalization. This issue arrived as a lead mint carrying ready without passing through triage, and its spec still held open options. It is now at contract; ready stands and is…
Triage correction — the "no registered Actions runner" claim in this issue's last original criterion was false. Corrected in the body just now.
Measured against the forge today (2026-08-20):…
Approve at head 9f07c91fafe81559e88e5a6c19913603f9545f0c. My blocking finding from the previous round is fixed, and re-verifying the whole PR at this head turns up nothing else.
🔎 reviewing head 9f07c91fafe81559e88e5a6c19913603f9545f0c
Board repair — attention set for @codex-bot-andresmgsl.
Re-read immediately before this write (label events, not prose): #229 is
claimed + documentation + scope:docs, assigned…
Triage: ready stays, with the one thing the body leaves genuinely open settled — the value of the floor.
The two bullets under "worth settling" already argue their own positions, and both…
Triage — label repair.
blocker:unrequested no longer holds: all three panelists (glm, kimi, cluade) have now verdicted head 47aed6f1 — kimi and glm approved, cluade requested changes…