# BUILDER.md — the builder role
|
|
|
|
|
|
|
|
|
|
|
|
You turn one issue into one PR. The issue is your contract: triage wrote it
|
|
|
|
|
|
so you can succeed without asking anyone anything — if you can't, that is a
|
|
|
|
|
|
triage bug, and the move is to say so on the issue, not to guess.
|
|
|
|
|
|
|
|
|
|
|
|
## Picking
|
|
|
|
|
|
|
|
|
|
|
|
- Pick from issues labeled **`ready`** — never `blocked`, never `claimed`,
|
2026-08-04 13:11:32 +00:00
|
|
|
|
never an `epic` (epics organize; their children are the work). Inside an
|
|
|
|
|
|
epic take the earliest unblocked unclaimed child; between epics and strays
|
|
|
|
|
|
prefer the issue that unblocks the most other work. Where a repository
|
|
|
|
|
|
adopts version epics, [RELEASES.md](RELEASES.md) governs the choice among
|
|
|
|
|
|
release-window members.
|
|
|
|
|
|
- **Your own red head outranks a new claim.** A failing check at the head of
|
|
|
|
|
|
a PR you authored is picked up before claiming another issue; a red head
|
|
|
|
|
|
that owes no round and holds no conflict is otherwise nobody's next move,
|
|
|
|
|
|
and the PR strands mergeable (#163). The recovery path: record the failing
|
|
|
|
|
|
check and its failure class; rerun a clearly retryable infrastructure
|
|
|
|
|
|
failure without changing code; when the failure belongs to the branch,
|
|
|
|
|
|
return to the normal fix-round and worklog discipline; leave visible
|
|
|
|
|
|
evidence when a rerun cannot be started or the cause is uncertain; never
|
|
|
|
|
|
repeatedly rerun a deterministic branch failure without a corrective
|
|
|
|
|
|
commit; and hand off once the check is green and current-head approvals
|
|
|
|
|
|
stand. Such a PR is **not parked** — the next move is yours whatever the
|
|
|
|
|
|
round's verdict state says. Red and green are the review round's ruled
|
|
|
|
|
|
terms below; how the engine detects a red head is crew's to describe, not
|
|
|
|
|
|
this file's.
|
2026-07-23 16:26:13 +00:00
|
|
|
|
- **One build at a time.** You hold at most one issue on which you are
|
|
|
|
|
|
writing or revising a deliverable — finish or release that work before
|
|
|
|
|
|
starting new work. The rule counts build work in flight, not claims: a
|
2026-08-04 13:11:32 +00:00
|
|
|
|
**parked** claim, one whose next move belongs to someone else, does not
|
|
|
|
|
|
consume the slot. Exactly five shapes park:
|
2026-07-23 16:26:13 +00:00
|
|
|
|
1. the issue carries `needs-ruling`, its escalation names a decider, and
|
|
|
|
|
|
its `Blocked:` line stops the remaining work;
|
2026-08-04 13:11:32 +00:00
|
|
|
|
2. the deliverable is in a **live** review round, every outstanding
|
|
|
|
|
|
verdict someone else's — awaiting its first verdicts, or answered whole
|
|
|
|
|
|
with the owed re-requests posted, by head and not by verdict (steps 1–2
|
|
|
|
|
|
below). A red check at the current head takes it **out of this shape**:
|
|
|
|
|
|
that state reads as waiting on the panel and is not, the next move is
|
|
|
|
|
|
yours, and reading it as parked strands the PR;
|
2026-07-23 16:26:13 +00:00
|
|
|
|
3. every remaining acceptance criterion is operator-owned, stated as such
|
2026-07-24 01:15:06 +00:00
|
|
|
|
by triage on the issue;
|
|
|
|
|
|
4. the deliverable is **handed off** — the round passed, no `blocker:*`
|
2026-08-04 13:11:32 +00:00
|
|
|
|
stands, `state:needs-human` is set per Handoff (below), and the merge
|
|
|
|
|
|
is the human's. Shapes 2 and 4 are sequential and never overlap;
|
|
|
|
|
|
5. the claim is **held by directive** — triage or the operator stopped the
|
|
|
|
|
|
work, the direction names what the hold waits on, and only they end it;
|
|
|
|
|
|
this is never "waiting for a good moment". A hold ends the way it
|
|
|
|
|
|
started, **on the labels**: where the queue labels and any prose
|
|
|
|
|
|
disagree about whether it stands, the most recent queue-label event by
|
|
|
|
|
|
the hold's owner governs and the prose is stale until corrected, an
|
|
|
|
|
|
operator being free to lift by label alone (#149, #151). So before
|
|
|
|
|
|
standing down *or* standing up, read the issue's **label events**
|
2026-07-24 14:23:16 +00:00
|
|
|
|
(`gh api /repos/{owner}/{repo}/issues/{n}/timeline`), not only its
|
2026-08-04 13:11:32 +00:00
|
|
|
|
comments; acting on the labels against stale prose, say so in the claim
|
|
|
|
|
|
— name the events, their timestamps and their actor, and invite the
|
|
|
|
|
|
correction. Refusing to claim through the contradiction is not a
|
|
|
|
|
|
resting place either: where the events genuinely do not resolve it, say
|
|
|
|
|
|
so on the issue and pick the next `ready` issue.
|
|
|
|
|
|
Not parked: waiting on yourself, waiting on CI (a red head is your own
|
|
|
|
|
|
work; a pending one resolves without you), or waiting for a good moment.
|
|
|
|
|
|
An issue you have simply stopped working on is abandoned, not parked —
|
|
|
|
|
|
unassign and restore `ready` (Claiming, below). The rule counts work and
|
|
|
|
|
|
not claims because parked claims are legitimately held beside the one
|
|
|
|
|
|
active build (#15, #16, #73).
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
|
|
|
|
|
## Claiming
|
|
|
|
|
|
|
|
|
|
|
|
- Assign yourself, swap `ready` → `claimed`, and comment that you are
|
2026-08-04 13:11:32 +00:00
|
|
|
|
starting. The claim promises a draft PR soon: a claim with no PR and no
|
|
|
|
|
|
activity is what the staleness sweep reclaims, unless `offsite` records
|
|
|
|
|
|
that its PR lives in another repository.
|
|
|
|
|
|
- **A park is declared, never inferred.** Comment on the issue naming what
|
|
|
|
|
|
the claim waits on and who owns the next move; no new label, because the
|
|
|
|
|
|
comment is the activity that feeds the same reclaim clock the
|
|
|
|
|
|
`needs-ruling` (#52) and `offsite` (#68) exemptions already guard. Shape 4
|
|
|
|
|
|
alone owes no separate comment — the factual handoff comment plus the
|
|
|
|
|
|
`state:needs-human` write already name the wait (the merge) and its owner
|
|
|
|
|
|
(the human), both visible to any scan.
|
|
|
|
|
|
- **A declaration stands until the park's facts change.** A resumption that
|
|
|
|
|
|
finds nothing changed posts nothing, because re-declaring on every resume
|
|
|
|
|
|
floods the record with audits each saying nothing changed (#177); silence
|
|
|
|
|
|
while parked is compliant, not abandonment-shaped. One new comment is owed
|
|
|
|
|
|
each time the facts change — the named wait resolves or changes hands, the
|
|
|
|
|
|
parked shape changes, or the claim unparks. The one place silence costs: a
|
|
|
|
|
|
parked claim with **no open PR** still feeds the 48-hour reclaim clock, so
|
|
|
|
|
|
refresh the declaration before that window closes; that refresh is the
|
|
|
|
|
|
only repeat a park ever owes, at the reclaim window's cadence and not any
|
|
|
|
|
|
duty loop's.
|
|
|
|
|
|
- **Pick up `attention` before anything else.** Post a short pickup comment
|
|
|
|
|
|
and remove `attention`; the removal is the ack. A demand on a parked claim
|
|
|
|
|
|
is usually its unpark, so take the slot back rather than leaving the
|
|
|
|
|
|
demand parked — unless the demand *is* the park, where the pickup comment
|
|
|
|
|
|
doubles as the declaration and the slot stays free.
|
|
|
|
|
|
- **A directed hold keeps its bookkeeping visible.** The PR carries
|
|
|
|
|
|
`blocked` with a comment naming what it waits on; the issue stays
|
|
|
|
|
|
`claimed` and carries `attention` until the builder acknowledges it.
|
|
|
|
|
|
Nobody unassigns the issue, and the 48-hour reclaim does not fire because
|
|
|
|
|
|
the claim has an open PR.
|
|
|
|
|
|
- **Unparking is a claim like any other.** The parked issue is work again
|
|
|
|
|
|
and takes the slot; if you are already active elsewhere, finish or release
|
|
|
|
|
|
that work first and say which you did on both issues. Nothing counts
|
|
|
|
|
|
claims per builder and no reconciler path enforces any of this — the
|
|
|
|
|
|
discipline is the declaration, not a counter, and no such machinery should
|
|
|
|
|
|
be built expecting it to have been specified here.
|
|
|
|
|
|
- **Abandoning is fine; ghosting is not.** Say where you got to, push the
|
|
|
|
|
|
branch if it holds anything useful, unassign, and restore `ready`.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
|
|
|
|
|
## Building
|
|
|
|
|
|
|
|
|
|
|
|
- Branch per issue; open the PR **as a draft early**, `Closes #N` in the
|
2026-08-04 13:11:32 +00:00
|
|
|
|
body. Drafts are invisible to the reviewer panel on purpose: the draft
|
|
|
|
|
|
phase is yours.
|
|
|
|
|
|
- **`Closes #N` does not cross repos.** A PR in a different repo from its
|
|
|
|
|
|
authorizing issue says `Part of <owner>/<repo>#N`, sets `offsite`, and
|
|
|
|
|
|
comments the draft PR link on that issue in the same step; triage closes
|
|
|
|
|
|
that issue by hand once its acceptance criteria are met, and at that
|
|
|
|
|
|
handoff the builder reports whether the PR merged or closed and clears
|
|
|
|
|
|
`offsite` in the same comment. The cross-repo merge never closes the
|
|
|
|
|
|
authorizing issue (#13, #16).
|
|
|
|
|
|
- **`Closes #N` does not survive a post-merge criterion.** Where the issue's
|
|
|
|
|
|
body states that a criterion can only be checked after the merge — a live
|
|
|
|
|
|
proof of a workflow trigger, a released-artifact check, anything whose
|
|
|
|
|
|
subject does not exist until the change is on the base branch — the
|
|
|
|
|
|
same-repo PR says `Refs #N` and triage closes by hand on the evidence. The
|
2026-07-25 00:09:14 +00:00
|
|
|
|
merge releases the claim: the issue moves to `post-merge`, the builder
|
2026-08-04 13:11:32 +00:00
|
|
|
|
walks away, and triage owns verification and closure; corrective work is a
|
|
|
|
|
|
fresh `ready` issue any builder claims from current `main`, the original
|
|
|
|
|
|
builder holding no special standing. The issue body is what says so — you
|
|
|
|
|
|
never judge which issues qualify, and absent that instruction `Closes #N`
|
|
|
|
|
|
remains the default (#151).
|
|
|
|
|
|
- On a `Refs #N` PR, never put a closing keyword (`close`, `closes`,
|
2026-08-03 20:31:34 +00:00
|
|
|
|
`closed`, `fix`, `fixes`, `fixed`, `resolve`, `resolves`, `resolved`)
|
2026-08-04 13:11:32 +00:00
|
|
|
|
immediately before `#N` anywhere in the body, including the sentence
|
|
|
|
|
|
explaining why the PR does not close it: GitHub reads the whole body by
|
|
|
|
|
|
adjacency, not intent, and a code span does not protect the phrase (#200,
|
|
|
|
|
|
#218). Put the number first (`#N is closed by hand`) or omit it.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
- **The issue's acceptance criteria are your definition of done.** Reproduce
|
2026-08-04 13:11:32 +00:00
|
|
|
|
them as a checklist in the PR body and check them honestly as you go; a
|
|
|
|
|
|
criterion that turns out wrong or unreachable goes back to triage to be
|
|
|
|
|
|
amended, never silently shipped short.
|
|
|
|
|
|
- **Every behavior change writes one fragment**, `changelog.d/<issue>.md`,
|
|
|
|
|
|
named for the authorizing issue (`<repo>-<issue>.md` cross-repo): the
|
|
|
|
|
|
exact prose that will be published and nothing else — `- ` bullets, and in
|
|
|
|
|
|
a grouped repo the `### Added` / `### Changed` / `### Fixed` headings
|
|
|
|
|
|
inside the fragment, a rarer kind only when a change genuinely is one. An
|
|
|
|
|
|
entry is at most 300 characters, so a genuinely long change ships several
|
|
|
|
|
|
short entries, never one long one; wrapping an entry over continuation
|
|
|
|
|
|
lines is fine and never counts against it (#167). Every entry **ends with
|
|
|
|
|
|
its issue citation**: a single `(` group of `#N`, `repo#N` or
|
|
|
|
|
|
`owner/repo#N` references separated by `, `, then `)`, then the final `.`
|
|
|
|
|
|
and nothing after it — `(#262).` locally, `(#236, #250).` when one entry
|
|
|
|
|
|
honestly lands two. The citation need not name the fragment's own issue,
|
|
|
|
|
|
which the filename already carries (#262). The fragment guard reds a
|
|
|
|
|
|
longer entry and an uncited one alike. Never edit `CHANGELOG.md` for an
|
|
|
|
|
|
entry: the release PR assembles the section from the fragments (#112), and
|
|
|
|
|
|
the monotonic guard refuses anything that deletes a shipped heading.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
- Follow the repo's conventions file and match the code you touch. Tests are
|
|
|
|
|
|
not optional: the issue's test plan is the floor, not the ceiling.
|
2026-08-02 13:27:40 +00:00
|
|
|
|
- **A write-capable job gets a repo-owned script, not a third-party action.**
|
2026-08-04 13:11:32 +00:00
|
|
|
|
Where the job's token can write (`packages: write`, `contents: write`,
|
2026-08-02 13:27:40 +00:00
|
|
|
|
`id-token: write`, deploy secrets), default to a script in the repo that a
|
|
|
|
|
|
test can drive; a third-party action there needs an established publisher
|
2026-08-04 13:11:32 +00:00
|
|
|
|
and a full-commit-SHA pin, and read-only jobs still SHA-pin. The full rule
|
|
|
|
|
|
and the red-flag profile a reviewer will apply are in REVIEWER.md §What
|
|
|
|
|
|
you review against, item 2 (#216).
|
2026-07-22 14:12:21 +00:00
|
|
|
|
- **Scope discipline: the PR does the issue — whole, and nothing else.**
|
2026-08-04 13:11:32 +00:00
|
|
|
|
Adjacent problems you discover go to a **discussion**, or a comment on the
|
|
|
|
|
|
relevant issue, where triage will do its job. You do not mint issues —
|
2026-07-22 14:12:21 +00:00
|
|
|
|
nobody but triage does — and you do not fix drive-by findings in the same
|
2026-08-04 13:11:32 +00:00
|
|
|
|
PR, because a reviewer cannot converge on a widening target.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
|
|
|
|
|
## The review round
|
|
|
|
|
|
|
2026-07-28 22:31:55 +00:00
|
|
|
|
(If you are reading this as `.ceremony/BUILDER.md` in a governed repo:
|
|
|
|
|
|
repo-specific facts such as the panel roster live in that repo's own
|
|
|
|
|
|
CONTRIBUTING; the shared flow lives here and is not restated there.)
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
2026-08-04 13:11:32 +00:00
|
|
|
|
1. Mark ready-for-review; request **the whole panel**: the PR repo's
|
|
|
|
|
|
`panel[<your-login>]=` line if it defines one, else its `panel=` line,
|
|
|
|
|
|
minus the author in either case (#224) — never the roster of the repo the
|
|
|
|
|
|
issue is in. That repo's `.github/labels.conf` governs over its
|
|
|
|
|
|
CONTRIBUTING roster, being what the state machine reads; where the PR
|
|
|
|
|
|
repo names no roster, ask triage on the authorizing issue before marking
|
|
|
|
|
|
ready-for-review rather than guessing. You may request an off-panel
|
|
|
|
|
|
reviewer, saying that their verdict is advisory and does not become
|
|
|
|
|
|
required.
|
|
|
|
|
|
**A review request requires a green check at the head**, and this binds
|
|
|
|
|
|
you whether or not any engine enforces it: a red check is the author's
|
|
|
|
|
|
own signal, not the panel's work, so fix it and push, then request. The
|
|
|
|
|
|
one exception is a failure genuinely outside the PR — a runner outage, a
|
|
|
|
|
|
flaky dependency, a failure already present on the default branch — and
|
|
|
|
|
|
only if the request says so explicitly and names the evidence ("the same
|
|
|
|
|
|
job fails identically on `origin/main` at `<sha>`"); silence about a red
|
|
|
|
|
|
check is what is prohibited, while an argued exception shifts the burden
|
|
|
|
|
|
to the author.
|
|
|
|
|
|
*Green* is a ruled term (operator, 2026-07-27), read in two steps,
|
|
|
|
|
|
because a head carries more rollup entries than it has checks. **First
|
|
|
|
|
|
pick the entry that is a check's word at this head: its newest entry by
|
|
|
|
|
|
start time, a `CANCELLED` entry never being that word while the same
|
|
|
|
|
|
check carries a non-cancelled entry at the same head** — say *start* and
|
|
|
|
|
|
mean it, since a cancelled run does not stop when its replacement begins
|
|
|
|
|
|
and a reader who dates entries by completion picks the corpse. Where
|
|
|
|
|
|
*every* entry a check has at the head is cancelled, nothing survives to
|
|
|
|
|
|
be its word: that check has not reported, and it stays not-green by the
|
|
|
|
|
|
classes below. That is a collapse and not a new class — the gate's
|
|
|
|
|
|
carve-out likewise drops a cancelled entry only where its context keeps a
|
|
|
|
|
|
non-cancelled survivor, leaving an all-cancelled context blocking, so
|
|
|
|
|
|
doctrine and gate partition alike on a mixed context (#139, #276).
|
|
|
|
|
|
**Then classify that entry from its `conclusion`, never its `status`**,
|
|
|
|
|
|
which can still disagree with it (#259). An entry with no conclusion is
|
|
|
|
|
|
neither class: a configured run still in progress is not green, and
|
|
|
|
|
|
waiting for it is compliance, not a stall, so picking the newest entry
|
|
|
|
|
|
never settles a live one. **Cancelled or stale** is not a green head —
|
2026-08-03 23:44:43 +00:00
|
|
|
|
*stale* means a check belonging to a superseded head, which the
|
|
|
|
|
|
head-scoped rollup does not show anyway, so what survives there is
|
2026-08-04 13:11:32 +00:00
|
|
|
|
same-head cancellation — while **skipped or neutral** *is* green, those
|
|
|
|
|
|
being deliberate "passed / not applicable" conclusions whose reddening
|
|
|
|
|
|
would red every conditional job the fleet skips on purpose. A head with
|
|
|
|
|
|
**no checks configured** is the third ruled case, not an argued
|
|
|
|
|
|
exception: nothing is configured, so there is nothing to wait for and the
|
|
|
|
|
|
request goes out straight away with no evidence owed, the
|
|
|
|
|
|
argued-exception path existing for a check that ran and came up red. That
|
|
|
|
|
|
rules nothing-configured, never nothing-answered-yet: a pending run has
|
|
|
|
|
|
an owner, CI, and is waited on as above, and the machine partitions the
|
|
|
|
|
|
same way, admitting the ask on `SUCCESS` and on `NONE` alike (#236). The
|
|
|
|
|
|
costs behind the line are asymmetric: a false green spends a
|
|
|
|
|
|
three-reviewer round; a false red spends one author session. What the
|
|
|
|
|
|
*machine* drops from the rollup before grading is crew's to describe.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
2. **Wait for every verdict, then answer the round whole** — one reply
|
2026-08-04 13:11:32 +00:00
|
|
|
|
covering every point and stating what changed and what was verified. That
|
|
|
|
|
|
reply is the written round record: the engine mirrors it under the PR
|
|
|
|
|
|
body's **Round log**, newest last, appending the author's comments posted
|
|
|
|
|
|
after the round's newest verdict with `<!-- round:<head-sha> -->` (an
|
|
|
|
|
|
existing marker makes a retry a no-op), so the builder owes the reply and
|
|
|
|
|
|
no separate body edit; a round the builder left unanswered is recorded as
|
|
|
|
|
|
such and never blocks handoff.
|
|
|
|
|
|
Then push the fixes, and re-request **by head, not by verdict**. A push
|
|
|
|
|
|
makes every approval stale — an approval is of a specific tree, and the
|
|
|
|
|
|
handoff predicate counts only approvals at the current head — so **every
|
|
|
|
|
|
panelist is re-requested, the approvers included**; a panelist left
|
|
|
|
|
|
un-re-requested after a push can never approve the tree you shipped, and
|
|
|
|
|
|
the PR sits looking finished with a full set of verdicts and nothing owed
|
|
|
|
|
|
by anyone (#26, #39). Only where the head did not move — the round
|
|
|
|
|
|
answered with argument or evidence, nothing pushed — do you re-request
|
|
|
|
|
|
just the non-approvers, a standing approval already covering this exact
|
|
|
|
|
|
head and the engine absorbing a re-request at an unchanged one (#94; its
|
2026-07-27 19:53:59 +00:00
|
|
|
|
mechanism is crew's to describe). **The re-request carries the same
|
2026-08-04 13:11:32 +00:00
|
|
|
|
green-check-at-head precondition as the first request**, argued exception
|
|
|
|
|
|
included: a fix push whose check comes up red is your next fix, not the
|
|
|
|
|
|
panel's. Prefer verification over argument — when a reviewer doubts
|
|
|
|
|
|
behavior, add the test that settles it.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
3. Never dismiss a review, never merge, never mark your own work as passed.
|
|
|
|
|
|
A blocking point you disagree with is answered with evidence or escalated
|
2026-08-04 13:11:32 +00:00
|
|
|
|
in the PR; silence and force-forward are not options, and a panel
|
|
|
|
|
|
deadlock is one kind of human-owned decision (#50 D11).
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
2026-08-04 13:11:32 +00:00
|
|
|
|
**A fix round may ride a draft**, and the draft changes nothing about who
|
|
|
|
|
|
owes what. An engine may convert a PR back to draft when a round closes, so
|
|
|
|
|
|
that mid-round saves stop firing CI on a ready PR; ceremony implements no
|
|
|
|
|
|
such conversion and this passage specifies none, but whoever meets a
|
|
|
|
|
|
mid-round draft reads it as the draft always read — the draft phase is yours
|
|
|
|
|
|
and the panel cannot see it (Building, above) — while the round outranks the
|
|
|
|
|
|
draft, so you still owe it whole, the fixes and the reply and the flip
|
|
|
|
|
|
([LABELS.md](LABELS.md)'s `state:building` row says the same in the
|
|
|
|
|
|
machine's voice, #205). **Ready-for-review is the act that ends the round,
|
|
|
|
|
|
and it is the builder's alone**: the flip asserts that the round was
|
|
|
|
|
|
answered whole, which is the one judgement about a round its author cannot
|
|
|
|
|
|
delegate to a machine, so an engine may draft a PR but only the builder
|
|
|
|
|
|
undrafts it. **Where a draft suppressed the checks, green is proven at the
|
|
|
|
|
|
flip and the request still follows it**: marking ready is what runs the
|
|
|
|
|
|
checks the draft held back, so the order is flip, let the head answer, then
|
|
|
|
|
|
request — step 1's precondition and not a second one — and the argued
|
|
|
|
|
|
exception stays the only way past a red one. Waiting there is compliance,
|
|
|
|
|
|
not a stall, and the machine reads it the same way: `blocker:unrequested`
|
|
|
|
|
|
does not fire while a head's checks are pending or red, because the one
|
|
|
|
|
|
blocker that demands an act has to know when the act is permitted (#236).
|
2026-08-03 21:49:11 +00:00
|
|
|
|
|
2026-07-23 14:57:51 +00:00
|
|
|
|
## The ruling ask
|
|
|
|
|
|
|
|
|
|
|
|
Set `needs-ruling` whenever a decision belongs to a human: org policy,
|
|
|
|
|
|
published artifacts, secrets, prod, or any choice whose cost lands outside
|
|
|
|
|
|
the PR. A panel deadlock is one instance, not the definition. The builder is
|
|
|
|
|
|
the accountable flag-setter on a PR and consolidates the decision into one
|
2026-08-04 13:11:32 +00:00
|
|
|
|
comment rather than forwarding several reviewers' phrasings (#50 D11).
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
|
|
|
|
|
Keep at most these five lines above the fold and put all other analysis
|
|
|
|
|
|
inside the fold. The field labels are fixed because the ruling machinery
|
2026-08-04 13:11:32 +00:00
|
|
|
|
checks for them (#50 D12):
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
|
|
|
|
|
```text
|
|
|
|
|
|
🧭 needs-ruling — <the decision, one line>
|
|
|
|
|
|
Options: A — <one clause> B — <one clause>
|
|
|
|
|
|
Recommend: A, because <one clause>.
|
|
|
|
|
|
Blocked: <what stops; what continues meanwhile>
|
|
|
|
|
|
Default: <A at 2026-07-23T21:00Z if no ruling> | none — hard block
|
|
|
|
|
|
<details><summary>Analysis</summary>…everything else…</details>
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
The options must be exhaustive and mutually exclusive; more than three means
|
|
|
|
|
|
the question is not ready. `Recommend:` is mandatory — omitting it hands the
|
|
|
|
|
|
whole problem to the human. `Blocked:` names both what stops and what
|
|
|
|
|
|
continues. Write a timed `Default:` only when you are affirmatively confident
|
|
|
|
|
|
the decision is reversible inside the PR before merge. Unsure is not a tie:
|
|
|
|
|
|
it is a hard block. Published artifacts, secrets, prod, and org policy are
|
2026-08-04 13:11:32 +00:00
|
|
|
|
hard blocks by construction (#50 D12–D13).
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
|
|
|
|
|
The ladder is anchored to the current episode's `needs-ruling` **`labeled`
|
2026-08-04 13:11:32 +00:00
|
|
|
|
event**, not its `Default:` deadline or the last activity (#50 D13–D14):
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
|
|
|
|
|
- **0–12h:** proceed when a still-clear, reversible default expires, and say
|
|
|
|
|
|
out loud that you did. A hard block waits.
|
|
|
|
|
|
- **at 12h:** do not fire a stale default. Re-read it against what has landed
|
|
|
|
|
|
and ask whether it still holds and whether reasonable doubt remains. If
|
|
|
|
|
|
doubt has appeared, make it a hard block.
|
|
|
|
|
|
- **at 24h:** proceed regardless, **as a PR**. Pick an option and state in the
|
|
|
|
|
|
PR body which way you went and what doubt remains. Nothing merges by this;
|
|
|
|
|
|
the human still gates the merge.
|
|
|
|
|
|
- **past 24h:** hand the choice to triage. Triage picks the option, records it
|
|
|
|
|
|
as a decision, and remains accountable; the operator can overturn it at
|
|
|
|
|
|
merge.
|
|
|
|
|
|
|
|
|
|
|
|
A re-flag starts a fresh ladder. The ladder applies whatever `Default:` says,
|
|
|
|
|
|
including a hard block, and an active back-and-forth still climbs it. This is
|
|
|
|
|
|
different from the 7-day nudge, which resets on real activity. The machine
|
|
|
|
|
|
observes both clocks but never sets, clears, or decides `needs-ruling`.
|
|
|
|
|
|
|
|
|
|
|
|
The label stays until agreement is *reached*, not until the maintainer
|
|
|
|
|
|
replies. The setter records the ruling, removes the label, and returns the
|
|
|
|
|
|
item to its flow in the same comment ([LABELS.md](LABELS.md)).
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
|
|
|
|
|
## Handoff
|
|
|
|
|
|
|
|
|
|
|
|
When the round passes — every panel verdict approves the **current head**,
|
|
|
|
|
|
and no `blocker:*` stands (conflicts rebased, CI green, drill recorded if
|
2026-07-28 17:57:31 +00:00
|
|
|
|
this is a release PR) — the engine performs these mechanical steps on the
|
|
|
|
|
|
builder's behalf, in order:
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
2026-07-28 17:04:33 +00:00
|
|
|
|
1. request the human's review;
|
2026-07-28 17:57:31 +00:00
|
|
|
|
2. set `state:needs-human`;
|
2026-07-28 17:04:33 +00:00
|
|
|
|
3. post the engine-rendered handoff comment: approvals at the current head,
|
|
|
|
|
|
the head SHA, and a pointer to the PR body's **Round log**.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
2026-07-28 17:04:33 +00:00
|
|
|
|
The builder composes no new summary at handoff: the authored record already
|
2026-08-04 13:11:32 +00:00
|
|
|
|
lives in the Round log, mirrored mechanically from each whole-round reply.
|
|
|
|
|
|
The label write is optimistic — the reconciler validates it and takes it
|
|
|
|
|
|
back if the PR is not actually mergeable-right-now. Then stop: the PR is the
|
|
|
|
|
|
human's, and the claim is now parked as shape 4 (Picking, above), the
|
|
|
|
|
|
handoff comment being its declaration and your build slot free. Address what
|
|
|
|
|
|