forked from heavy-duty/ceremony
7 lines
305 B
Markdown
7 lines
305 B
Markdown
|
|
### Added
|
||
|
|
|
||
|
|
- The issue-flow sweep's `claimed`-branch ruling pre-read is pinned: an
|
||
|
|
unassigned claim under `needs-ruling` must draw its board diagnostic and
|
||
|
|
its ruling nudge in one sweep, so a read that drifts below the diagnostic
|
||
|
|
reds instead of silently costing the escalation 7 days (#284, #307).
|