forked from heavy-duty/ceremony
docs(builder): bind the red-head trigger to the round's ruled terms
The red-head rule in Picking carried its own trigger definition at the pre-slim head; the squeeze took it, leaving 'failing check' and 'red check' classified only forward in the review round. At an all-cancelled head that let parked shape 2 read satisfied on its face, parking a claim the rule says is never parked (#163, #276). Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
This commit is contained in:
parent
49e1fe2e6e
commit
92c0e7c6f0
1 changed files with 10 additions and 8 deletions
18
BUILDER.md
18
BUILDER.md
|
|
@ -12,14 +12,16 @@ triage bug, and the move is to say so on the issue, not to guess.
|
|||
the most work; where a repo adopts version epics,
|
||||
[RELEASES.md](RELEASES.md) governs among window members.
|
||||
- **Your own red head outranks a new claim**: repair a failing check at your
|
||||
PR's head before claiming another issue (#163). Record the check and its
|
||||
failure class; rerun a clearly retryable infrastructure failure unchanged;
|
||||
treat a branch failure as an ordinary fix round, worklog and all; leave
|
||||
evidence where a rerun cannot start or the cause is unclear; never rerun a
|
||||
deterministic failure without a corrective commit; hand off once green
|
||||
with current-head approvals. Such a PR is **never parked**, whatever the
|
||||
verdict state says; how the engine detects a red head is crew's to
|
||||
describe.
|
||||
PR's head before claiming another issue (#163). Red and green here are the
|
||||
review round's ruled terms: cancelled, stale, or unreported — every entry
|
||||
at the head cancelled — is not green; skipped or neutral is. Record the
|
||||
check and its failure class; rerun a clearly retryable infrastructure
|
||||
failure unchanged; treat a branch failure as an ordinary fix round,
|
||||
worklog and all; leave evidence where a rerun cannot start or the cause is
|
||||
unclear; never rerun a deterministic failure without a corrective commit;
|
||||
hand off once green with current-head approvals. Such a PR is **never
|
||||
parked**, whatever the verdict state says; how the engine detects a red
|
||||
head is crew's to describe.
|
||||
- **One build at a time**: one issue on which you are writing or revising a
|
||||
deliverable, finished or released before you start more. The rule counts
|
||||
work in flight, not claims — a **parked** claim, whose next move is
|
||||
|
|
|
|||
Loading…
Reference in a new issue