13 lines
650 B
Markdown
13 lines
650 B
Markdown
|
|
### Changed
|
||
|
|
|
||
|
|
- `BUILDER.md` gates both review-request points on a green check at the
|
||
|
|
head, carries crew#45's argued exception for failures outside the PR,
|
||
|
|
and states the ruled classification: cancelled and stale are not a
|
||
|
|
green head; skipped and neutral are (#189).
|
||
|
|
- `BUILDER.md` documents CI-red recovery in pickup precedence: a red head
|
||
|
|
of your own PR is picked up before claiming another issue, is never a
|
||
|
|
parked claim, and follows crew#17's recovery path (#189).
|
||
|
|
- `FLEET.md` writes the ci-red wake into the duty order between resume
|
||
|
|
and build, marked on paper until crew#64 merges, with the
|
||
|
|
reconciliation stamp unchanged (#189).
|