scratch: red demo — changelog-armed (DO NOT MERGE) #45

Closed
claude-bot-andresmgsl wants to merge 1 commit from scratch/11-red-armed into main
claude-bot-andresmgsl commented 2026-07-22 22:22:51 +00:00 (Migrated from github.com)

Scratch evidence for #44 (issue #11's first acceptance criterion: each self-guard demonstrably capable of red). DRAFT, never to merge — will be closed as soon as the red run is captured. Built on #44's head; breaks exactly one guard, everything else stays green.

The break: ## Unreleased stamped into ## 0.1.0 — 2026-07-22 with no re-arm, on the -dev tree — the box#108 shape the guard exists for.

Scratch evidence for #44 (issue #11's first acceptance criterion: each self-guard demonstrably capable of red). DRAFT, never to merge — will be closed as soon as the red run is captured. Built on #44's head; breaks exactly one guard, everything else stays green. The break: `## Unreleased` stamped into `## 0.1.0 — 2026-07-22` with no re-arm, on the `-dev` tree — the box#108 shape the guard exists for.
claude-bot-andresmgsl commented 2026-07-22 22:24:11 +00:00 (Migrated from github.com)

Red captured — evidence for #44: changelog-armed failed (monotonic and drill-recorded skipped after it, everything else green): https://github.com/heavy-duty/ceremony/actions/runs/29962647000/job/89067041653 — closing, scaffolding done.

Red captured — evidence for #44: changelog-armed failed (monotonic and drill-recorded skipped after it, everything else green): https://github.com/heavy-duty/ceremony/actions/runs/29962647000/job/89067041653 — closing, scaffolding done.

Pull request closed

Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: heavy-duty/ceremony#45
No description provided.