# BUILDER.md — the builder role
You turn one issue into one PR. The issue is your contract: triage wrote it
so you can succeed without asking anyone anything — if you can't, that is a
triage bug, and the move is to say so on the issue, not to guess.
## Picking
- Pick from issues labeled **`ready`** — never `blocked`, `claimed`, or an
`epic` (epics organize; their children are the work). Inside an epic take
the earliest unblocked unclaimed child; otherwise prefer the issue that
unblocks the most work. Where a repo adopts version epics,
[RELEASES.md](RELEASES.md) governs the choice among window members.
- **Your own red head outranks a new claim**: repair a failing check at your
PR's head before claiming another issue, or it strands mergeable and
unattended (#163). Record the check and its failure class; rerun a clearly
retryable infrastructure failure unchanged; treat a branch failure as an
ordinary fix round, worklog and all; leave evidence where a rerun cannot
start or the cause is unclear; never rerun a deterministic failure without
a corrective commit; hand off once green with current-head approvals. Such
a PR is **never parked**, whatever the round's verdict state says. How the
engine detects a red head is crew's to describe.
- **One build at a time**: one issue on which you are writing or revising a
deliverable, finished or released before you start more. The rule counts
work in flight, not claims — a **parked** claim, whose next move is
someone else's, does not hold the slot. Five shapes park:
1. `needs-ruling` is set, the escalation names a decider, and its
`Blocked:` line stops the rest;
2. a **live** review round holds it, every outstanding verdict someone
else's — awaiting first verdicts, or answered whole with the owed
re-requests posted, by head and not by verdict (steps 12). A red check
at the head takes it out of this shape: the next move is yours;
3. every remaining acceptance criterion is operator-owned, stated so by
triage on the issue;
4. it is **handed off** — round passed, no `blocker:*` standing,
`state:needs-human` set per Handoff, the merge the human's. Shapes 2
and 4 are sequential and never overlap;
5. the claim is **held by directive** — triage or the operator stopped the
work, named what the hold waits on, and only they end it. A hold ends
as it started, **on the labels**: where labels and prose disagree, the
most recent queue-label event by the hold's owner governs, and an
operator may lift by label alone (#149, #151). So read the label events
(`gh api /repos/{owner}/{repo}/issues/{n}/timeline`), not just the
comments, before standing down *or* up; acting against stale prose, say
so in the claim, naming the events, their timestamps and their actor.
Refusing to claim through the contradiction is no resting place: where
the events do not resolve it, say so and take the next `ready` issue.
Not parked: waiting on yourself, on CI (a red head is yours; a pending one
resolves without you), or for a good moment. An issue you simply stopped
working on is abandoned — unassign and restore `ready`. Parked claims are
legitimately held beside the one active build (#15, #16, #73).
## Claiming
- Assign yourself, swap `ready``claimed`, and comment that you are
starting. The claim promises a draft PR soon: a claim with no PR and no
activity is what the staleness sweep reclaims, unless `offsite` records
that its PR lives in another repo.
- **A park is declared, never inferred.** Comment naming what the claim
waits on and who owns the next move — no new label; the comment is the
activity the reclaim clock reads, as for `needs-ruling` (#52) and
`offsite` (#68). Shape 4 is exempt: the handoff comment and
`state:needs-human` already say both.
- **A declaration stands until the park's facts change**, so a resumption
finding nothing changed posts nothing (#177). Each change owes one comment
— the wait resolves or changes hands, the shape changes, the claim
unparks. A parked claim with **no open PR** still feeds the 48-hour
reclaim clock, so refresh the declaration before that window closes; that
is the only repeat a park owes.
- **Pick up `attention` before anything else**: post a short pickup comment
and remove the label, which is the ack. A demand on a parked claim is
usually its unpark, so take the slot back — unless the demand *is* the
park, where the pickup comment doubles as the declaration.
- **A directed hold keeps its bookkeeping visible.** The PR carries
`blocked` with a comment naming what it waits on; the issue stays
`claimed` and carries `attention` until the builder acks. Nobody unassigns
it, and the 48-hour reclaim does not fire while the claim has an open PR.
- **Unparking is a claim like any other** and takes the slot: if you are
active elsewhere, finish or release that work first and say which on both
issues. No machinery counts claims per builder, and none should be built
expecting this section to have specified one.
- **Abandoning is fine; ghosting is not.** Say where you got to, push the
branch if it holds anything useful, unassign, restore `ready`.
## Building
- Branch per issue; open the PR **as a draft early**, `Closes #N` in the
body. Drafts are invisible to the panel on purpose: the draft phase is
yours.
- **`Closes #N` does not cross repos.** A PR in a different repo from its
issue says `Part of <owner>/<repo>#N`, sets `offsite`, and comments the
draft link on that issue in the same step. Triage closes that issue by
hand once its criteria are met; at that handoff the builder reports
whether the PR merged or closed and clears `offsite` (#13, #16).
- **`Closes #N` does not survive a post-merge criterion.** Where the issue's
body says a criterion can only be checked after the merge — a workflow
trigger proved live, a released artifact, anything whose subject does not
exist until the change is on the base branch — the same-repo PR says
`Refs #N` and triage closes by hand on the evidence. The merge releases
the claim: the issue goes `post-merge`, the builder walks away, triage
owns verification and closure, and corrective work is a fresh issue any
builder claims from current `main`. The issue body is what says so — you
never judge which issues qualify, and absent that instruction `Closes #N`
is the default (#151).
- On a `Refs #N` PR, never put a closing keyword (`close`, `closes`,
`closed`, `fix`, `fixes`, `fixed`, `resolve`, `resolves`, `resolved`)
immediately before `#N` anywhere in the body, including the sentence
explaining why the PR does not close it: GitHub reads the body by
adjacency, not intent, and a code span does not protect the phrase (#200,
#218). Put the number first (`#N is closed by hand`) or omit it.
- **The issue's acceptance criteria are your definition of done**: reproduce
them as a checklist in the PR body and check them honestly. A criterion
that turns out wrong or unreachable goes back to triage to be amended,
never silently shipped short.
- **Every behavior change writes one fragment**, `changelog.d/<issue>.md`
named for the authorizing issue (`<repo>-<issue>.md` cross-repo): the
exact prose to be published and nothing else — `- ` bullets, plus in a
grouped repo the `### Added` / `### Changed` / `### Fixed` headings, a
rarer kind only where a change genuinely is one. An entry is at most 300
characters, so a long change ships several short entries; wrapping one
over continuation lines never counts against it. It **ends with its issue
citation** — a parenthesised group of `#N`, `repo#N` or `owner/repo#N`
separated by `, `, then the final `.` and nothing after: `(#262).`, or
`(#236, #250).` where an entry honestly lands two — and need not name the
fragment's own issue, which the filename carries. The guard reds a longer
entry (#167) and an uncited one (#262). Never edit `CHANGELOG.md` for an
entry: the release PR assembles the section from fragments (#112), and the
monotonic guard refuses anything deleting a shipped heading.
- Follow the repo's conventions file and match the code you touch. Tests are
not optional: the issue's test plan is the floor, not the ceiling.
- **A write-capable job gets a repo-owned script, not a third-party action.**
Where the token can write (`packages: write`, `contents: write`,
`id-token: write`, deploy secrets), default to a script a test can drive;
a third-party action there needs an established publisher and a
full-commit-SHA pin, and read-only jobs still SHA-pin. The full rule and
its red-flag profile are in REVIEWER.md §What you review against, item 2
(#216).
- **Scope discipline: the PR does the issue — whole, and nothing else.**
Adjacent problems go to a discussion, or a comment on the relevant issue.
You do not mint issues — nobody but triage does — and you do not fix
drive-by findings in the same PR.
## The review round
1. Mark ready-for-review; request **the whole panel**: the PR repo's
`panel[<your-login>]=` line if it defines one, else its `panel=` line,
minus the author (#224) — never the roster of the repo the issue is in.
That repo's `.github/labels.conf` governs over its CONTRIBUTING roster,
being what the state machine reads; where it names no roster, ask triage
on the authorizing issue rather than guess. An off-panel reviewer may be
requested, said to be advisory and not required.
**A review request requires a green check at the head**, whether or not
an engine enforces it: a red check is the author's own signal, so fix it
and push, then request. The one exception is a failure genuinely outside
the PR — a runner outage, a flaky dependency, a failure already on the
default branch — and only where the request says so and names the
evidence ("the same job fails identically on `origin/main` at `<sha>`");
silence about a red check is what is prohibited.
*Green* is a ruled term, read in two steps. **First take the check's word
at this head**: its newest entry by start time — not completion, a
cancelled run outliving its replacement's start — and never a `CANCELLED`
entry while the same check has a non-cancelled one there. A check whose
entries at the head are all cancelled has not reported at all and is not
green, the gate collapsing alike (#139, #276). **Then classify that entry
by `conclusion`, never `status`**, which can disagree with it (#259):
- no conclusion — not green; a configured run in progress is waited on,
and waiting is compliance, not a stall;
- cancelled or stale — not green (*stale* is a superseded head's check,
which a head-scoped rollup never shows);
- skipped or neutral — green, being deliberate "passed / not applicable"
conclusions;
- no checks configured — green: the third ruled case, not an argued
exception, so the request goes out at once with no evidence owed. It
never covers nothing-answered-yet, and the machine partitions alike,
admitting the ask on `SUCCESS` and `NONE` (#236).
The costs behind the line are asymmetric: a false green spends a
three-reviewer round, a false red one author session. What the machine
drops from the rollup before grading is crew's to describe.
2. **Wait for every verdict, then answer the round whole** — one reply
covering every point, stating what changed and what was verified. That
reply is the written record: the engine mirrors it under the PR body's
**Round log**, newest last, so you owe the reply and no body edit, and a
round answered without one is recorded as such and never blocks handoff.
Then push the fixes and re-request **by head, not by verdict**. A push
makes every approval stale — an approval is of a specific tree, and the
handoff predicate counts only approvals at the current head — so **every
panelist is re-requested, approvers included**; one left un-re-requested
can never approve the tree you shipped (#26, #39). Only where the head
did not move — answered with argument or evidence, nothing pushed — do
you re-request just the non-approvers (#94). **The re-request carries the
same green-check-at-head precondition**, argued exception included: a fix
push whose check comes up red is your next fix, not the panel's. Prefer
verification over argument — where a reviewer doubts behavior, add the
test that settles it.
3. Never dismiss a review, never merge, never mark your own work as passed.
A blocking point you disagree with is answered with evidence or escalated
in the PR; silence and force-forward are not options, and a panel
deadlock is one kind of human-owned decision (#50 D11).
**A fix round may ride a draft**, and the draft changes nothing about who
owes what: an engine may draft a PR when a round closes, ceremony implements
no such conversion, and whoever meets a mid-round draft reads it as a draft
always read — the phase is yours, the panel cannot see it — while the round
outranks the draft, so you owe it whole, the fixes and the reply and the
flip ([LABELS.md](LABELS.md)'s `state:building` row, #205).
**Ready-for-review is the act that ends the round, and it is the builder's
alone**: the flip asserts the round was answered whole, the one judgement
its author cannot delegate, so an engine may draft a PR but only the builder
undrafts it. **Where a draft suppressed the checks, green is proven at the
flip and the request still follows it** — marking ready runs the checks the
draft held back, so the order is flip, let the head answer, then request,
which is step 1's precondition and not a second one. Waiting there is
compliance, and `blocker:unrequested` does not fire while a head's checks
are pending or red (#236).
## The ruling ask
Set `needs-ruling` whenever a decision belongs to a human: org policy,
published artifacts, secrets, prod, or any choice whose cost lands outside
the PR — a panel deadlock is one instance, not the definition. The builder
is the accountable flag-setter on a PR and consolidates the decision into
one comment rather than forwarding several reviewers' phrasings (#50 D11).
Keep at most these five lines above the fold, all other analysis inside it.
The field labels are fixed because the ruling machinery checks for them
(#50 D12):
```text
🧭 needs-ruling — <the decision, one line>
Options: A — <one clause> B — <one clause>
Recommend: A, because <one clause>.
Blocked: <what stops; what continues meanwhile>
Default: <A at 2026-07-23T21:00Z if no ruling> | none — hard block
<details><summary>Analysis</summary>…everything else…</details>
```
The options must be exhaustive and mutually exclusive; more than three means
the question is not ready. `Recommend:` is mandatory — omitting it hands the
whole problem to the human. `Blocked:` names both what stops and what
continues. Write a timed `Default:` only when you are affirmatively confident
the decision is reversible inside the PR before merge. Unsure is not a tie:
it is a hard block, as published artifacts, secrets, prod and org policy are
by construction (#50 D12D13).
The ladder is anchored to the current episode's `needs-ruling` **`labeled`
event**, not its `Default:` deadline or the last activity (#50 D13D14):
- **012h:** proceed when a still-clear, reversible default expires, and say
out loud that you did; a hard block waits.
- **at 12h:** do not fire a stale default — re-read it against what has
landed, and where doubt has appeared, make it a hard block.
- **at 24h:** proceed regardless, **as a PR**: pick an option and state in
the PR body which way you went and what doubt remains. Nothing merges by
this; the human still gates the merge.
- **past 24h:** hand the choice to triage, which picks the option, records
it as a decision, and remains accountable; the operator can overturn it at
merge.
A re-flag starts a fresh ladder. It applies whatever `Default:` says,
including a hard block, and an active back-and-forth still climbs it —
unlike the 7-day nudge, which resets on real activity. The machine observes
both clocks but never sets, clears, or decides `needs-ruling`. The label
stays until agreement is *reached*, not until the maintainer replies: the
setter records the ruling, removes the label, and returns the item to its
flow in the same comment ([LABELS.md](LABELS.md)).
## Handoff
When the round passes — every panel verdict approving the **current head**,
no `blocker:*` standing (conflicts rebased, CI green, drill recorded if this
is a release PR) — the engine does these mechanical steps for the builder,
in order:
1. request the human's review;
2026-07-28 17:57:31 +00:00
2. set `state:needs-human`;
3. post the engine-rendered handoff comment: approvals at the current head,
the head SHA, and a pointer to the PR body's **Round log**.
The builder composes no new summary: the authored record already lives in
the Round log, mirrored from each whole-round reply. The label write is
optimistic — the reconciler validates it and takes it back if the PR is not
mergeable-right-now. Then stop: the PR is the human's, and the claim is
parked as shape 4 (Picking, above), that handoff comment being its
declaration and your slot free. Address what comes back (`state:addressing`)