# BUILDER.md — the builder role
|
|
|
|
|
|
|
|
|
|
|
|
You turn one issue into one PR. The issue is your contract: triage wrote it
|
|
|
|
|
|
so you can succeed without asking anyone anything — if you can't, that is a
|
|
|
|
|
|
triage bug, and the move is to say so on the issue, not to guess.
|
|
|
|
|
|
|
|
|
|
|
|
## Picking
|
|
|
|
|
|
|
|
|
|
|
|
- Pick from issues labeled **`ready`** — never `blocked`, never `claimed`,
|
2026-08-04 13:11:32 +00:00
|
|
|
|
never an `epic` (epics organize; their children are the work). Inside an
|
|
|
|
|
|
epic take the earliest unblocked unclaimed child; between epics and strays
|
|
|
|
|
|
prefer the issue that unblocks the most other work. Where a repository
|
|
|
|
|
|
adopts version epics, [RELEASES.md](RELEASES.md) governs the choice among
|
|
|
|
|
|
release-window members.
|
2026-08-04 13:14:35 +00:00
|
|
|
|
- **Your own red head outranks a new claim.** Pick up a failing check at the
|
2026-08-04 13:16:37 +00:00
|
|
|
|
head of a PR you authored before claiming another issue, or it strands
|
|
|
|
|
|
mergeable and unattended (#163). Record the failing check and its failure
|
2026-08-04 13:14:35 +00:00
|
|
|
|
class; rerun a clearly retryable infrastructure failure without changing
|
2026-08-04 13:16:37 +00:00
|
|
|
|
code; return to the normal fix-round and worklog discipline where the
|
|
|
|
|
|
failure belongs to the branch; leave visible evidence where a rerun cannot
|
2026-08-04 13:14:35 +00:00
|
|
|
|
be started or the cause is uncertain; never repeatedly rerun a
|
|
|
|
|
|
deterministic branch failure without a corrective commit; hand off once
|
|
|
|
|
|
the check is green and current-head approvals stand. Such a PR is **not
|
|
|
|
|
|
parked**, whatever the round's verdict state says. Red and green are the
|
2026-08-04 13:16:37 +00:00
|
|
|
|
ruled terms of the review round below; how the engine detects a red head
|
|
|
|
|
|
is crew's to describe, not this file's.
|
2026-08-04 13:14:35 +00:00
|
|
|
|
- **One build at a time**: at most one issue on which you are writing or
|
|
|
|
|
|
revising a deliverable, finished or released before you start new work.
|
|
|
|
|
|
The rule counts build work in flight, not claims — a **parked** claim,
|
|
|
|
|
|
whose next move belongs to someone else, does not consume the slot.
|
|
|
|
|
|
Exactly five shapes park:
|
|
|
|
|
|
1. `needs-ruling` is set, the escalation names a decider, and its
|
|
|
|
|
|
`Blocked:` line stops the remaining work;
|
|
|
|
|
|
2. a **live** review round holds the deliverable, every outstanding
|
2026-08-04 13:11:32 +00:00
|
|
|
|
verdict someone else's — awaiting its first verdicts, or answered whole
|
|
|
|
|
|
with the owed re-requests posted, by head and not by verdict (steps 1–2
|
2026-08-04 13:14:35 +00:00
|
|
|
|
below). A red check at the current head takes it out of this shape: the
|
|
|
|
|
|
next move is yours, and reading that as parked strands the PR;
|
2026-07-23 16:26:13 +00:00
|
|
|
|
3. every remaining acceptance criterion is operator-owned, stated as such
|
2026-07-24 01:15:06 +00:00
|
|
|
|
by triage on the issue;
|
|
|
|
|
|
4. the deliverable is **handed off** — the round passed, no `blocker:*`
|
2026-08-04 13:14:35 +00:00
|
|
|
|
stands, `state:needs-human` is set per Handoff, and the merge is the
|
|
|
|
|
|
human's. Shapes 2 and 4 are sequential and never overlap;
|
2026-08-04 13:11:32 +00:00
|
|
|
|
5. the claim is **held by directive** — triage or the operator stopped the
|
2026-08-04 13:14:35 +00:00
|
|
|
|
work, the direction names what the hold waits on, and only they end it.
|
|
|
|
|
|
A hold ends the way it started, **on the labels**: where labels and
|
2026-08-04 13:16:37 +00:00
|
|
|
|
prose disagree, the most recent queue-label event by the hold's owner
|
2026-08-04 13:14:35 +00:00
|
|
|
|
governs, an operator being free to lift by label alone (#149, #151). So
|
2026-08-04 13:16:37 +00:00
|
|
|
|
read the label events (`gh api /repos/{owner}/{repo}/issues/{n}/timeline`),
|
|
|
|
|
|
not only the comments, before standing down *or* standing up, and where
|
|
|
|
|
|
you act against stale prose say so in the claim, naming the events,
|
|
|
|
|
|
their timestamps and their actor. Refusing to claim through the
|
|
|
|
|
|
contradiction is no resting place: where the events do not resolve it,
|
|
|
|
|
|
say so on the issue and take the next `ready` issue.
|
2026-08-04 13:14:35 +00:00
|
|
|
|
Not parked: waiting on yourself, on CI (a red head is your own work; a
|
|
|
|
|
|
pending one resolves without you), or for a good moment. An issue you have
|
|
|
|
|
|
simply stopped working on is abandoned, not parked — unassign and restore
|
2026-08-04 13:16:37 +00:00
|
|
|
|
`ready`. The rule counts work because parked claims are legitimately held
|
|
|
|
|
|
beside the one active build (#15, #16, #73).
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
|
|
|
|
|
## Claiming
|
|
|
|
|
|
|
|
|
|
|
|
- Assign yourself, swap `ready` → `claimed`, and comment that you are
|
2026-08-04 13:11:32 +00:00
|
|
|
|
starting. The claim promises a draft PR soon: a claim with no PR and no
|
|
|
|
|
|
activity is what the staleness sweep reclaims, unless `offsite` records
|
|
|
|
|
|
that its PR lives in another repository.
|
|
|
|
|
|
- **A park is declared, never inferred.** Comment on the issue naming what
|
2026-08-04 13:14:35 +00:00
|
|
|
|
the claim waits on and who owns the next move; no new label, the comment
|
|
|
|
|
|
being the activity that feeds the same reclaim clock the `needs-ruling`
|
|
|
|
|
|
(#52) and `offsite` (#68) exemptions guard. Shape 4 owes no separate
|
|
|
|
|
|
comment: the handoff comment plus the `state:needs-human` write already
|
|
|
|
|
|
name the wait (the merge) and its owner (the human).
|
2026-08-04 13:11:32 +00:00
|
|
|
|
- **A declaration stands until the park's facts change.** A resumption that
|
|
|
|
|
|
finds nothing changed posts nothing, because re-declaring on every resume
|
2026-08-04 13:14:35 +00:00
|
|
|
|
floods the record with audits each saying nothing changed (#177). One new
|
|
|
|
|
|
comment is owed each time the facts change — the named wait resolves or
|
|
|
|
|
|
changes hands, the parked shape changes, or the claim unparks. A parked
|
|
|
|
|
|
claim with **no open PR** still feeds the 48-hour reclaim clock, so
|
2026-08-04 13:11:32 +00:00
|
|
|
|
refresh the declaration before that window closes; that refresh is the
|
2026-08-04 13:14:35 +00:00
|
|
|
|
only repeat a park owes, at the reclaim window's cadence.
|
2026-08-04 13:11:32 +00:00
|
|
|
|
- **Pick up `attention` before anything else.** Post a short pickup comment
|
|
|
|
|
|
and remove `attention`; the removal is the ack. A demand on a parked claim
|
2026-08-04 13:14:35 +00:00
|
|
|
|
is usually its unpark, so take the slot back — unless the demand *is* the
|
|
|
|
|
|
park, where the pickup comment doubles as the declaration and the slot
|
|
|
|
|
|
stays free.
|
2026-08-04 13:11:32 +00:00
|
|
|
|
- **A directed hold keeps its bookkeeping visible.** The PR carries
|
|
|
|
|
|
`blocked` with a comment naming what it waits on; the issue stays
|
|
|
|
|
|
`claimed` and carries `attention` until the builder acknowledges it.
|
|
|
|
|
|
Nobody unassigns the issue, and the 48-hour reclaim does not fire because
|
|
|
|
|
|
the claim has an open PR.
|
2026-08-04 13:14:35 +00:00
|
|
|
|
- **Unparking is a claim like any other** and takes the slot: if you are
|
|
|
|
|
|
active elsewhere, finish or release that work first and say which you did
|
|
|
|
|
|
on both issues. Nothing counts claims per builder and no reconciler path
|
|
|
|
|
|
enforces this — the discipline is the declaration, not a counter, and no
|
|
|
|
|
|
such machinery should be built expecting it to have been specified here.
|
2026-08-04 13:11:32 +00:00
|
|
|
|
- **Abandoning is fine; ghosting is not.** Say where you got to, push the
|
|
|
|
|
|
branch if it holds anything useful, unassign, and restore `ready`.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
|
|
|
|
|
## Building
|
|
|
|
|
|
|
|
|
|
|
|
- Branch per issue; open the PR **as a draft early**, `Closes #N` in the
|
2026-08-04 13:11:32 +00:00
|
|
|
|
body. Drafts are invisible to the reviewer panel on purpose: the draft
|
|
|
|
|
|
phase is yours.
|
|
|
|
|
|
- **`Closes #N` does not cross repos.** A PR in a different repo from its
|
|
|
|
|
|
authorizing issue says `Part of <owner>/<repo>#N`, sets `offsite`, and
|
2026-08-04 13:14:35 +00:00
|
|
|
|
comments the draft PR link on that issue in the same step. Triage closes
|
2026-08-04 13:16:37 +00:00
|
|
|
|
that issue by hand once its acceptance criteria are met, and at that
|
|
|
|
|
|
handoff the builder reports whether the PR merged or closed and clears
|
|
|
|
|
|
`offsite` in the same comment (#13, #16).
|
2026-08-04 13:11:32 +00:00
|
|
|
|
- **`Closes #N` does not survive a post-merge criterion.** Where the issue's
|
|
|
|
|
|
body states that a criterion can only be checked after the merge — a live
|
|
|
|
|
|
proof of a workflow trigger, a released-artifact check, anything whose
|
|
|
|
|
|
subject does not exist until the change is on the base branch — the
|
|
|
|
|
|
same-repo PR says `Refs #N` and triage closes by hand on the evidence. The
|
2026-07-25 00:09:14 +00:00
|
|
|
|
merge releases the claim: the issue moves to `post-merge`, the builder
|
2026-08-04 13:14:35 +00:00
|
|
|
|
walks away, and triage owns verification and closure, returning it to
|
2026-08-04 13:16:37 +00:00
|
|
|
|
`ready` or minting a fresh issue for corrective work that any builder
|
|
|
|
|
|
claims from current `main`. The issue body is what says so — you never
|
|
|
|
|
|
judge which issues qualify, and absent that instruction `Closes #N` is the
|
|
|
|
|
|
default (#151).
|
2026-08-04 13:11:32 +00:00
|
|
|
|
- On a `Refs #N` PR, never put a closing keyword (`close`, `closes`,
|
2026-08-03 20:31:34 +00:00
|
|
|
|
`closed`, `fix`, `fixes`, `fixed`, `resolve`, `resolves`, `resolved`)
|
2026-08-04 13:11:32 +00:00
|
|
|
|
immediately before `#N` anywhere in the body, including the sentence
|
2026-08-04 13:14:35 +00:00
|
|
|
|
explaining why the PR does not close it: GitHub reads the body by
|
2026-08-04 13:11:32 +00:00
|
|
|
|
adjacency, not intent, and a code span does not protect the phrase (#200,
|
|
|
|
|
|
#218). Put the number first (`#N is closed by hand`) or omit it.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
- **The issue's acceptance criteria are your definition of done.** Reproduce
|
2026-08-04 13:11:32 +00:00
|
|
|
|
them as a checklist in the PR body and check them honestly as you go; a
|
|
|
|
|
|
criterion that turns out wrong or unreachable goes back to triage to be
|
|
|
|
|
|
amended, never silently shipped short.
|
2026-08-04 13:14:35 +00:00
|
|
|
|
- **Every behavior change writes one fragment**, `changelog.d/<issue>.md`
|
2026-08-04 13:11:32 +00:00
|
|
|
|
named for the authorizing issue (`<repo>-<issue>.md` cross-repo): the
|
2026-08-04 13:14:35 +00:00
|
|
|
|
exact prose to be published and nothing else — `- ` bullets, plus in a
|
|
|
|
|
|
grouped repo the `### Added` / `### Changed` / `### Fixed` headings inside
|
|
|
|
|
|
the fragment, a rarer kind only where a change genuinely is one. An entry
|
|
|
|
|
|
is at most 300 characters, so a genuinely long change ships several short
|
|
|
|
|
|
entries; wrapping one over continuation lines never counts against it. It
|
|
|
|
|
|
**ends with its issue citation**: one `(` group of `#N`, `repo#N` or
|
|
|
|
|
|
`owner/repo#N` separated by `, `, then `)`, then the final `.` and nothing
|
2026-08-04 13:16:37 +00:00
|
|
|
|
after it — `(#262).`, or `(#236, #250).` where an entry honestly lands two
|
|
|
|
|
|
— and it need not name the fragment's own issue, which the filename
|
|
|
|
|
|
carries. The guard reds a longer entry (#167) and an uncited one (#262)
|
|
|
|
|
|
alike. Never edit `CHANGELOG.md` for an entry: the release PR assembles
|
|
|
|
|
|
the section from the fragments (#112), and the monotonic guard refuses
|
|
|
|
|
|
anything that deletes a shipped heading.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
- Follow the repo's conventions file and match the code you touch. Tests are
|
|
|
|
|
|
not optional: the issue's test plan is the floor, not the ceiling.
|
2026-08-02 13:27:40 +00:00
|
|
|
|
- **A write-capable job gets a repo-owned script, not a third-party action.**
|
2026-08-04 13:11:32 +00:00
|
|
|
|
Where the job's token can write (`packages: write`, `contents: write`,
|
2026-08-02 13:27:40 +00:00
|
|
|
|
`id-token: write`, deploy secrets), default to a script in the repo that a
|
|
|
|
|
|
test can drive; a third-party action there needs an established publisher
|
2026-08-04 13:11:32 +00:00
|
|
|
|
and a full-commit-SHA pin, and read-only jobs still SHA-pin. The full rule
|
2026-08-04 13:14:35 +00:00
|
|
|
|
and the red-flag profile a reviewer applies are in REVIEWER.md §What you
|
|
|
|
|
|
review against, item 2 (#216).
|
2026-07-22 14:12:21 +00:00
|
|
|
|
- **Scope discipline: the PR does the issue — whole, and nothing else.**
|
2026-08-04 13:14:35 +00:00
|
|
|
|
Adjacent problems go to a **discussion**, or a comment on the relevant
|
|
|
|
|
|
issue, where triage does its job. You do not mint issues — nobody but
|
|
|
|
|
|
triage does — and you do not fix drive-by findings in the same PR, because
|
|
|
|
|
|
a reviewer cannot converge on a widening target.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
|
|
|
|
|
## The review round
|
|
|
|
|
|
|
2026-08-04 13:11:32 +00:00
|
|
|
|
1. Mark ready-for-review; request **the whole panel**: the PR repo's
|
|
|
|
|
|
`panel[<your-login>]=` line if it defines one, else its `panel=` line,
|
|
|
|
|
|
minus the author in either case (#224) — never the roster of the repo the
|
|
|
|
|
|
issue is in. That repo's `.github/labels.conf` governs over its
|
|
|
|
|
|
CONTRIBUTING roster, being what the state machine reads; where the PR
|
2026-08-04 13:16:37 +00:00
|
|
|
|
repo names no roster, ask triage on the authorizing issue rather than
|
|
|
|
|
|
guessing. An off-panel reviewer may be requested, saying that their
|
|
|
|
|
|
verdict is advisory and does not become required.
|
2026-08-04 13:14:35 +00:00
|
|
|
|
**A review request requires a green check at the head**, and that binds
|
2026-08-04 13:11:32 +00:00
|
|
|
|
you whether or not any engine enforces it: a red check is the author's
|
|
|
|
|
|
own signal, not the panel's work, so fix it and push, then request. The
|
|
|
|
|
|
one exception is a failure genuinely outside the PR — a runner outage, a
|
|
|
|
|
|
flaky dependency, a failure already present on the default branch — and
|
2026-08-04 13:14:35 +00:00
|
|
|
|
only where the request says so explicitly and names the evidence ("the
|
2026-08-04 13:16:37 +00:00
|
|
|
|
same job fails identically on `origin/main` at `<sha>`"); silence about a
|
|
|
|
|
|
red check is what is prohibited.
|
2026-08-04 13:11:32 +00:00
|
|
|
|
*Green* is a ruled term (operator, 2026-07-27), read in two steps,
|
|
|
|
|
|
because a head carries more rollup entries than it has checks. **First
|
2026-08-04 13:14:35 +00:00
|
|
|
|
find the check's word at this head**: its newest entry by start time,
|
|
|
|
|
|
except that a `CANCELLED` entry is never the word while the same check
|
2026-08-04 13:16:37 +00:00
|
|
|
|
has a non-cancelled entry at that head. Date entries by start, not by
|
2026-08-04 13:14:35 +00:00
|
|
|
|
completion — a cancelled run outlives its replacement's start, so the
|
|
|
|
|
|
other reading picks the corpse. A check whose every entry at the head is
|
2026-08-04 13:16:37 +00:00
|
|
|
|
cancelled has not reported and stays not-green by the classes below; that
|
|
|
|
|
|
is a collapse and not a new class, the gate likewise dropping a cancelled
|
|
|
|
|
|
entry only where its context keeps a non-cancelled survivor (#139, #276).
|
2026-08-04 13:11:32 +00:00
|
|
|
|
**Then classify that entry from its `conclusion`, never its `status`**,
|
2026-08-04 13:14:35 +00:00
|
|
|
|
which can still disagree with it (#259). No conclusion at all is neither
|
|
|
|
|
|
class: a configured run still in progress is not green, and waiting on it
|
|
|
|
|
|
is compliance, not a stall. **Cancelled or stale** is not green — *stale*
|
|
|
|
|
|
means a superseded head's check, which a head-scoped rollup never shows,
|
|
|
|
|
|
so what survives there is same-head cancellation. **Skipped or neutral**
|
|
|
|
|
|
*is* green: those are deliberate "passed / not applicable" conclusions,
|
|
|
|
|
|
and reddening them would red every conditional job the fleet skips on
|
|
|
|
|
|
purpose. **No checks configured** is the third ruled case, not an argued
|
|
|
|
|
|
exception: nothing is configured, so nothing is waited for and the
|
|
|
|
|
|
request goes out at once, no evidence owed. That rules
|
|
|
|
|
|
nothing-configured, never nothing-answered-yet — a pending run has an
|
|
|
|
|
|
owner, CI — and the machine partitions alike, admitting the ask on
|
|
|
|
|
|
`SUCCESS` and on `NONE` (#236). The costs behind the line are asymmetric:
|
|
|
|
|
|
a false green spends a three-reviewer round, a false red one author
|
|
|
|
|
|
session. What the *machine* drops from the rollup before grading is
|
|
|
|
|
|
crew's to describe.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
2. **Wait for every verdict, then answer the round whole** — one reply
|
2026-08-04 13:11:32 +00:00
|
|
|
|
covering every point and stating what changed and what was verified. That
|
|
|
|
|
|
reply is the written round record: the engine mirrors it under the PR
|
2026-08-04 13:14:35 +00:00
|
|
|
|
body's **Round log**, newest last, so the builder owes the reply and no
|
|
|
|
|
|
separate body edit, and a round answered without one is recorded as such
|
|
|
|
|
|
and never blocks handoff.
|
|
|
|
|
|
Then push the fixes and re-request **by head, not by verdict**. A push
|
2026-08-04 13:11:32 +00:00
|
|
|
|
makes every approval stale — an approval is of a specific tree, and the
|
|
|
|
|
|
handoff predicate counts only approvals at the current head — so **every
|
2026-08-04 13:14:35 +00:00
|
|
|
|
panelist is re-requested, the approvers included**; one left
|
|
|
|
|
|
un-re-requested can never approve the tree you shipped, and the PR sits
|
|
|
|
|
|
looking finished with nothing owed by anyone (#26, #39). Only where the
|
|
|
|
|
|
head did not move — the round answered with argument or evidence, nothing
|
|
|
|
|
|
pushed — do you re-request just the non-approvers, a standing approval
|
|
|
|
|
|
already covering this exact head (#94). **The re-request carries the same
|
2026-08-04 13:16:37 +00:00
|
|
|
|
green-check-at-head precondition**, argued exception included: a fix push
|
|
|
|
|
|
whose check comes up red is your next fix, not the panel's. Prefer
|
|
|
|
|
|
verification over argument — where a reviewer doubts behavior, add the
|
|
|
|
|
|
test that settles it.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
3. Never dismiss a review, never merge, never mark your own work as passed.
|
|
|
|
|
|
A blocking point you disagree with is answered with evidence or escalated
|
2026-08-04 13:11:32 +00:00
|
|
|
|
in the PR; silence and force-forward are not options, and a panel
|
|
|
|
|
|
deadlock is one kind of human-owned decision (#50 D11).
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
2026-08-04 13:11:32 +00:00
|
|
|
|
**A fix round may ride a draft**, and the draft changes nothing about who
|
|
|
|
|
|
owes what. An engine may convert a PR back to draft when a round closes, so
|
|
|
|
|
|
that mid-round saves stop firing CI on a ready PR; ceremony implements no
|
2026-08-04 13:16:37 +00:00
|
|
|
|
such conversion, but whoever meets a mid-round draft reads it as a draft
|
|
|
|
|
|
always read — the draft phase is yours and the panel cannot see it — while
|
|
|
|
|
|
the round outranks the draft, so you still owe it whole, the fixes and the
|
|
|
|
|
|
reply and the flip ([LABELS.md](LABELS.md)'s `state:building` row, #205).
|
|
|
|
|
|
**Ready-for-review is the act that ends the round, and it is the builder's
|
|
|
|
|
|
alone**: the flip asserts that the round was answered whole, the one
|
|
|
|
|
|
judgement about a round its author cannot delegate, so an engine may draft a
|
|
|
|
|
|
PR but only the builder undrafts it. **Where a draft suppressed the checks,
|
|
|
|
|
|
green is proven at the flip and the request still follows it**: marking
|
|
|
|
|
|
ready is what runs the checks the draft held back, so the order is flip, let
|
|
|
|
|
|
the head answer, then request — step 1's precondition, not a second one —
|
|
|
|
|
|
and waiting there is compliance, not a stall, which is why
|
|
|
|
|
|
`blocker:unrequested` does not fire while a head's checks are pending or red
|
|
|
|
|
|
(#236).
|
2026-08-03 21:49:11 +00:00
|
|
|
|
|
2026-07-23 14:57:51 +00:00
|
|
|
|
## The ruling ask
|
|
|
|
|
|
|
|
|
|
|
|
Set `needs-ruling` whenever a decision belongs to a human: org policy,
|
|
|
|
|
|
published artifacts, secrets, prod, or any choice whose cost lands outside
|
|
|
|
|
|
the PR. A panel deadlock is one instance, not the definition. The builder is
|
|
|
|
|
|
the accountable flag-setter on a PR and consolidates the decision into one
|
2026-08-04 13:11:32 +00:00
|
|
|
|
comment rather than forwarding several reviewers' phrasings (#50 D11).
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
|
|
|
|
|
Keep at most these five lines above the fold and put all other analysis
|
|
|
|
|
|
inside the fold. The field labels are fixed because the ruling machinery
|
2026-08-04 13:11:32 +00:00
|
|
|
|
checks for them (#50 D12):
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
|
|
|
|
|
```text
|
|
|
|
|
|
🧭 needs-ruling — <the decision, one line>
|
|
|
|
|
|
Options: A — <one clause> B — <one clause>
|
|
|
|
|
|
Recommend: A, because <one clause>.
|
|
|
|
|
|
Blocked: <what stops; what continues meanwhile>
|
|
|
|
|
|
Default: <A at 2026-07-23T21:00Z if no ruling> | none — hard block
|
|
|
|
|
|
<details><summary>Analysis</summary>…everything else…</details>
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
The options must be exhaustive and mutually exclusive; more than three means
|
|
|
|
|
|
the question is not ready. `Recommend:` is mandatory — omitting it hands the
|
|
|
|
|
|
whole problem to the human. `Blocked:` names both what stops and what
|
|
|
|
|
|
continues. Write a timed `Default:` only when you are affirmatively confident
|
|
|
|
|
|
the decision is reversible inside the PR before merge. Unsure is not a tie:
|
|
|
|
|
|
it is a hard block. Published artifacts, secrets, prod, and org policy are
|
2026-08-04 13:11:32 +00:00
|
|
|
|
hard blocks by construction (#50 D12–D13).
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
|
|
|
|
|
The ladder is anchored to the current episode's `needs-ruling` **`labeled`
|
2026-08-04 13:11:32 +00:00
|
|
|
|
event**, not its `Default:` deadline or the last activity (#50 D13–D14):
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
|
|
|
|
|
- **0–12h:** proceed when a still-clear, reversible default expires, and say
|
2026-08-04 13:16:37 +00:00
|
|
|
|
out loud that you did; a hard block waits.
|
|
|
|
|
|
- **at 12h:** do not fire a stale default — re-read it against what has
|
|
|
|
|
|
landed, and where doubt has appeared, make it a hard block.
|
|
|
|
|
|
- **at 24h:** proceed regardless, **as a PR**: pick an option and state in
|
|
|
|
|
|
the PR body which way you went and what doubt remains. Nothing merges by
|
|
|
|
|
|
this; the human still gates the merge.
|
|
|
|
|
|
- **past 24h:** hand the choice to triage, which picks the option, records
|
|
|
|
|
|
it as a decision, and remains accountable; the operator can overturn it at
|
2026-07-23 14:57:51 +00:00
|
|
|
|
merge.
|
|
|
|
|
|
|
|
|
|
|
|
A re-flag starts a fresh ladder. The ladder applies whatever `Default:` says,
|
2026-08-04 13:16:37 +00:00
|
|
|
|
including a hard block, and an active back-and-forth still climbs it — unlike
|
|
|
|
|
|
the 7-day nudge, which resets on real activity. The machine observes both
|
|
|
|
|
|
clocks but never sets, clears, or decides `needs-ruling`.
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
|
|
|
|
|
The label stays until agreement is *reached*, not until the maintainer
|
|
|
|
|
|
replies. The setter records the ruling, removes the label, and returns the
|
|
|
|
|
|
item to its flow in the same comment ([LABELS.md](LABELS.md)).
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
|
|
|
|
|
## Handoff
|
|
|
|
|
|
|
|
|
|
|
|
When the round passes — every panel verdict approves the **current head**,
|
|
|
|
|
|
and no `blocker:*` stands (conflicts rebased, CI green, drill recorded if
|
2026-07-28 17:57:31 +00:00
|
|
|
|
this is a release PR) — the engine performs these mechanical steps on the
|
|
|
|
|
|
builder's behalf, in order:
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
2026-07-28 17:04:33 +00:00
|
|
|
|
1. request the human's review;
|
2026-07-28 17:57:31 +00:00
|
|
|
|
2. set `state:needs-human`;
|
2026-07-28 17:04:33 +00:00
|
|
|
|
3. post the engine-rendered handoff comment: approvals at the current head,
|
|
|
|
|
|
the head SHA, and a pointer to the PR body's **Round log**.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
2026-07-28 17:04:33 +00:00
|
|
|
|
The builder composes no new summary at handoff: the authored record already
|
2026-08-04 13:14:35 +00:00
|
|
|
|
lives in the Round log, mirrored from each whole-round reply. The label write
|
|
|
|
|
|
is optimistic — the reconciler validates it and takes it back if the PR is
|
|
|
|
|
|
not actually mergeable-right-now. Then stop: the PR is the human's, and the
|
|
|
|
|
|
claim is parked as shape 4 (Picking, above), that handoff comment being its
|
|
|
|
|
|
declaration and your build slot free. Address what comes back
|
|
|
|
|
|
(`state:addressing`) and re-hand-off the same way.
|