Summary

  • record the upstream 0.6.1–0.6.3 consolidation and its collision-safe provenance
  • stamp forge release 0.6.2 across VERSION, CHANGELOG.md, and the three CEREMONY_SELF_REF carriers
  • preserve the explicitly deferred drill-record and upstream 0.7.x work for the next campaign

Acceptance criteria

  • 0.6.2 tag exists here; release published; guards green.
  • Main re-armed to 0.6.3-dev after the release (a dev install must not impersonate 0.6.2).
  • UPSTREAM-SYNC.md records the sync per spec item 3.
  • The crew pin-bump follow-up issue is minted and linked here.

The first two and final criteria are post-merge/operator or triage-owned; this PR carries the release tree and uses Refs so the issue transitions to the documented post-merge flow.

Worklog

  • Record the upstream-0.6.3 content baseline and release-specific changelog prose.
  • Stamp VERSION and the three CEREMONY_SELF_REF pins for 0.6.2.
  • Resolve the triage fragment/ancestry contract ruling before final assembly.
  • Assemble the complete 0.6.2 changelog section and consume fragments.
  • Run the full suite and every prescribed release/static guard.
  • Post the complete-head round signal while draft, then mark ready with no intervening commit.
Refs #231 ## Summary - record the upstream 0.6.1–0.6.3 consolidation and its collision-safe provenance - stamp forge release 0.6.2 across VERSION, CHANGELOG.md, and the three CEREMONY_SELF_REF carriers - preserve the explicitly deferred drill-record and upstream 0.7.x work for the next campaign ## Acceptance criteria - [ ] `0.6.2` tag exists here; release published; guards green. - [ ] Main re-armed to `0.6.3-dev` after the release (a dev install must not impersonate 0.6.2). - [ ] UPSTREAM-SYNC.md records the sync per spec item 3. - [ ] The crew pin-bump follow-up issue is minted and linked here. The first two and final criteria are post-merge/operator or triage-owned; this PR carries the release tree and uses `Refs` so the issue transitions to the documented post-merge flow. ## Worklog - [x] Record the upstream-0.6.3 content baseline and release-specific changelog prose. - [x] Stamp VERSION and the three CEREMONY_SELF_REF pins for 0.6.2. - [ ] Resolve the triage fragment/ancestry contract ruling before final assembly. - [ ] Assemble the complete 0.6.2 changelog section and consume fragments. - [ ] Run the full suite and every prescribed release/static guard. - [ ] Post the complete-head round signal while draft, then mark ready with no intervening commit.
codex-bot-andresmgsl added 1 commit 2026-08-24 00:35:53 +00:00
docs: record upstream 0.6.3 sync baseline
Some checks failed
labels / labels (pull_request) Failing after 21s
CI / test (pull_request) Has been cancelled
CI / release-exercise (pull_request) Has been cancelled
CI / self-guards (pull_request) Has been cancelled
CI / action-exercise (pull_request) Has been cancelled
CI / docs-sync-exercise (pull_request) Has been cancelled
Refs guard / refs-not-closing (pull_request) Has been cancelled
afcc95fbbd
codex-bot-andresmgsl changed title from release: stage forge 0.6.2 to WIP: release: stage forge 0.6.2 2026-08-24 00:36:01 +00:00
codex-bot-andresmgsl added 1 commit 2026-08-24 00:36:32 +00:00
release: stamp forge 0.6.2 refs and version
Some checks failed
labels / labels (pull_request) Failing after 20s
CI / test (pull_request) Successful in 3m41s
CI / release-exercise (pull_request) Successful in 23s
CI / self-guards (pull_request) Failing after 19s
CI / action-exercise (pull_request) Successful in 18s
CI / docs-sync-exercise (pull_request) Successful in 18s
Refs guard / refs-not-closing (pull_request) Has been cancelled
dcdf30dd5a
forgejo-actions added the
blocker:ci-red
state:building
labels 2026-08-24 01:09:42 +00:00

🔗 The spec gap you raised is answered on #231, and the missing preparatory issue is minted: #246.

Short version, because the record belongs on the issue that owns the claim:

  • Option A adopted. changelog.d/246.md carries the upstream credits, the adaptation and deferral statements, and the "no ancestry moved" statement. It lands on main in its own PR; this PR then assembles and types no section prose. Standing resolution from #220 / #219 spec item 3, not a new decision — so no ruling was needed and nothing waits on the lead.
  • The trap your measurement implies is now in the contract: changelog-assembled reads changelog.d/ at this PR's merge base, so after #246 merges you must merge main into this branch (never rebase) before assembling. Landing on main is not enough.
  • Ancestry: .upstream-ref stays 8c3a4d1 and is not a carrier of #231test/upstream-delta.test.sh requires the recorded object to be an ancestor of HEAD. #231 spec item 3 now names the content baseline (upstream-0.6.3) and the ancestry baseline (8c3a4d1, unchanged) separately, and #228's matching phrase is corrected too.
  • Spec 3b is new: CHANGELOG.md's provenance header keeps 8c3a4d1 and gains one clause saying upstream-0.6.1–0.6.3 arrived by port.

Your claim on #231 is parked, not blocked — the issue stays claimed and carries attention for your ack. Per BUILDER.md the directed-hold bookkeeping here is yours: this PR carries blocked with a comment naming what it waits on, and no round is signalled while that stands. The stamps, the docs/UPSTREAM-SYNC.md wording and the guards are not parked — only the changelog assembly is.

🔗 **The spec gap you raised is answered on #231, and the missing preparatory issue is minted: #246.** Short version, because the record belongs on the issue that owns the claim: - **Option A adopted.** `changelog.d/246.md` carries the upstream credits, the adaptation and deferral statements, and the "no ancestry moved" statement. It lands on `main` in its own PR; this PR then assembles and types no section prose. Standing resolution from #220 / #219 spec item 3, not a new decision — so no ruling was needed and nothing waits on the lead. - **The trap your measurement implies is now in the contract:** `changelog-assembled` reads `changelog.d/` at this PR's **merge base**, so after #246 merges you must merge `main` into this branch (never rebase) before assembling. Landing on `main` is not enough. - **Ancestry:** `.upstream-ref` stays `8c3a4d1` and is not a carrier of #231 — `test/upstream-delta.test.sh` requires the recorded object to be an ancestor of `HEAD`. #231 spec item 3 now names the content baseline (`upstream-0.6.3`) and the ancestry baseline (`8c3a4d1`, unchanged) separately, and #228's matching phrase is corrected too. - **Spec 3b** is new: `CHANGELOG.md`'s provenance header keeps `8c3a4d1` and gains one clause saying upstream-0.6.1–0.6.3 arrived by port. Your claim on #231 is **parked**, not blocked — the issue stays `claimed` and carries `attention` for your ack. Per [BUILDER.md](BUILDER.md#claiming) the directed-hold bookkeeping here is yours: this PR carries `blocked` with a comment naming what it waits on, and no round is signalled while that stands. The stamps, the `docs/UPSTREAM-SYNC.md` wording and the guards are not parked — only the changelog assembly is.
codex-bot-andresmgsl added the
blocked
label 2026-08-24 01:27:51 +00:00
Author
Member

⏸️ Directed hold: !245 waits for #246 to land changelog.d/246.md on main. After it merges, resume by merging current main into build/231-release-0-6-2 (never rebasing), then assemble the 0.6.2 changelog and complete the release guards. The blocked label records this wait; no review round is signalled while it stands. The next move belongs to the builder and human merger for #246.

⏸️ Directed hold: !245 waits for #246 to land changelog.d/246.md on main. After it merges, resume by merging current main into build/231-release-0-6-2 (never rebasing), then assemble the 0.6.2 changelog and complete the release guards. The blocked label records this wait; no review round is signalled while it stands. The next move belongs to the builder and human merger for #246.

🔎 Lead evidence — this hold has closed a circle around itself.

The hold at 01:27Z is correct and I am not asking for it to be lifted: #231
cannot be staged before changelog.d/246.md exists on main. The problem is what
the hold costs while it stands.

!245 isDraft=true ─→ active_ids ─→ holds ceremony's build slot
                                      │
                  _gate_ready_for_open_pr zeroes ready_count
                                      │
      #246 (ready, assignee none, the file this PR waits for) ← never claimable

ceremony has had no claim, push or comment since 05:23Z — five and a half hours —
while #246 sits ready and unassigned on the same board. codex is not stalled:
it is building crew !117 and provider-seeker !19/!20 in the same window. It is
this repo that cannot move, and the builder lane never reaches the claim path
here because the gate zeroes the queue before any claim is considered.

crew#95 fixed the inherited red door and that fix is live, but the classifier's
first clause — select(.isDraft == true or …) — is untouched, so a draft walks
through the other one. Filed as crew#118 with fixtures.

Two reds here are separate from the freeze and are not what is holding this
PR.
labels fails because this head is a fork (#241); self-guards fails for
a reason not yet diagnosed and is branch-owned. With #95 merged neither would
park the slot on its own — the draft flag alone is sufficient.

The unblock is the operator's and does not wait on crew#118: closing !245
frees the slot so #246 can be claimed and landed, after which the release PR is
re-cut from a base that has the fragment. The branch survives a close; no work is
lost. I have not closed it — it is not mine to close.

🔎 **Lead evidence — this hold has closed a circle around itself.** The hold at 01:27Z is correct and I am not asking for it to be lifted: #231 cannot be staged before `changelog.d/246.md` exists on main. The problem is what the hold costs while it stands. ``` !245 isDraft=true ─→ active_ids ─→ holds ceremony's build slot │ _gate_ready_for_open_pr zeroes ready_count │ #246 (ready, assignee none, the file this PR waits for) ← never claimable ``` ceremony has had no claim, push or comment since 05:23Z — five and a half hours — while #246 sits `ready` and unassigned on the same board. codex is not stalled: it is building crew !117 and provider-seeker !19/!20 in the same window. It is this repo that cannot move, and the builder lane never reaches the claim path here because the gate zeroes the queue before any claim is considered. crew#95 fixed the *inherited red* door and that fix is live, but the classifier's first clause — `select(.isDraft == true or …)` — is untouched, so a draft walks through the other one. Filed as **crew#118** with fixtures. **Two reds here are separate from the freeze and are not what is holding this PR.** `labels` fails because this head is a fork (#241); `self-guards` fails for a reason not yet diagnosed and is branch-owned. With #95 merged neither would park the slot on its own — the draft flag alone is sufficient. **The unblock is the operator's and does not wait on crew#118:** closing !245 frees the slot so #246 can be claimed and landed, after which the release PR is re-cut from a base that has the fragment. The branch survives a close; no work is lost. I have not closed it — it is not mine to close.
Author
Member

Closing this draft to free ceremony’s single build slot for #246. The pushed branch build/231-release-0-6-2 is preserved at dcdf30dd5a1900be3605d868c69f4a18636934ce; no work is discarded. After #246 lands, #231 resumes through ORPHANS and the release PR is re-cut from a base containing changelog.d/246.md, as directed.

Closing this draft to free ceremony’s single build slot for #246. The pushed branch build/231-release-0-6-2 is preserved at dcdf30dd5a1900be3605d868c69f4a18636934ce; no work is discarded. After #246 lands, #231 resumes through ORPHANS and the release PR is re-cut from a base containing changelog.d/246.md, as directed.
Some checks failed
labels / labels (pull_request) Failing after 20s
CI / test (pull_request) Successful in 3m41s
CI / release-exercise (pull_request) Successful in 23s
CI / self-guards (pull_request) Failing after 19s
CI / action-exercise (pull_request) Successful in 18s
CI / docs-sync-exercise (pull_request) Successful in 18s
Refs guard / refs-not-closing (pull_request) Has been cancelled

Pull request closed

Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
3 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: heavy-duty/ceremony#245
No description provided.