feat(drill): a forgejo-runner lifecycle leg beside the GitHub one #130

Merged
andres merged 4 commits from build/129-forgejo-runner-drill-leg into main 2026-07-31 20:56:18 +00:00

4 commits

Author SHA1 Message Date
9afcdf858f fix(drill): the leg row is the whole lifecycle, not just the job
Some checks failed
ci / check (pull_request) Failing after 7s
ci / install (pull_request) Successful in 4s
ci / db-integration (pull_request) Successful in 4s
labels / labels (pull_request) Failing after 7s
codex, grok and kimi all landed on the same hole at e42ba31, and they are
right. The record row keyed only on fj_took, so install/status/remove failures
called `no` without gating it. A dispatched job only needs SOMETHING answering
runs-on: drill — and this leg removes locally, telling the operator to delete
the stale runner by hand, so a leftover drill-labeled runner from the previous
drill is the designed-for aftermath, not a contrived case. It answers the
fixture exactly, and the row then read "PASS — registered, took a job,
removed" for a drill whose install never happened.

The exit code was never wrong: every one of those failures also called `no`.
What was wrong is the row, and the row is what outlives the run in
drills/<v>.md. A row claiming a lifecycle that did not happen is exactly what
the gate exists to refuse — kimi's framing, and it is the right one.

forgejo_leg_row folds all five assertions, and the leg no longer dispatches
after install or status has failed: a foreign runner's success could only ever
be evidence about someone else's runner. The regression composes the real
functions over a payload carrying a newer successful run, the way the leg
composes them.

The GitHub leg has the identical shape and is byte-frozen by #129's contract;
left alone deliberately, and worth a sibling issue for triage.

Refs #129

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-07-31 20:04:16 +00:00
e42ba31a09 fix(drill): the pre-dispatch baseline folds max too, and the suite is hermetic
Some checks failed
ci / check (pull_request) Has been cancelled
ci / install (pull_request) Has been cancelled
ci / db-integration (pull_request) Has been cancelled
labels / labels (pull_request) Has been cancelled
Round 2 of !130. Both blockers were mine, and one was the same mistake I had
just fixed one layer up.

1. fj_pre still took `head -n1`. The verdict folds max over every id, but the
   PRE-DISPATCH snapshot did not, so an oldest-first payload named an old run
   as the baseline — and a later poll finding the same body then read the
   PREVIOUS drill's run as this dispatch's result. That is a false PASS on the
   take-a-job assertion, strictly worse than the false FAIL entry[0] caused
   inside the verdict. Both sides now share forgejo_max_task_id, and a test
   composes them the way the leg does so the pair cannot drift apart again.

2. test/drill.sh copied its pretty-printed fixture from /tmp/fjfix — a scratch
   path that existed only on the box the fix was built on. Everywhere else the
   cp failed, the guard returned pending, and the suite was 65/66. The claimed
   66/66 was true on one machine. The fixture is written inline like every
   other one; verified by deleting the scratch dir and running the suite from
   a clean tree under env -i.

Refs #129

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-07-31 00:29:06 +00:00
9c0e508b76 fix(drill): read every task, and fail a configured leg that cannot mint
Some checks failed
ci / check (pull_request) Has been cancelled
ci / install (pull_request) Has been cancelled
ci / db-integration (pull_request) Has been cancelled
labels / labels (pull_request) Has been cancelled
Addresses grok's and kimi's REQUEST_CHANGES on !130.

1. forgejo_run_verdict read only the FIRST entry of actions/tasks. That
   payload accumulates, so the moment a repo is drilled twice our run shares
   it with older ones — and nothing documents the sort order. A green job
   then reports as a timeout: a false FAILURE on the gate this leg exists to
   provide. It now inspects every entry and lets the newest id above pre_id
   decide. Newlines are stripped first, so a pretty-printed payload parses
   like a compact one.

2. A mint that yielded nothing degraded to SKIPPED "no registration token
   source" — violating #129's own acceptance ("token source present but the
   instance is unreachable -> the leg FAILS; it must not skip and must not
   pass") and sending the operator to check an env var they had already set.
   forgejo_token_verdict separates absent inputs from a configured leg that
   could not mint; only the former skips.

3. The pre---yes confirm block still announced a GitHub runner alone.

Refs #129

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-07-31 00:13:59 +00:00
1179d3142f feat(drill): a forgejo-runner lifecycle leg beside the GitHub one
Some checks failed
ci / check (pull_request) Has been cancelled
ci / install (pull_request) Has been cancelled
ci / db-integration (pull_request) Has been cancelled
labels / labels (pull_request) Has been cancelled
#109 shipped `rig forgejo-runner` and the drill never touched it, so the
release gate could pass with the whole family broken. Its only coverage was
15 argument-handling checks in test/cli.sh.

The Forgejo half cannot be a copy of the GitHub one. Measured against
forgejo.heavyduty.builders (8.0.3+gitea-1.22.0), not read from the docs:
GET actions/tasks carries NO `conclusion` field — `status` holds the terminal
outcome — `id` is a global task id while the URL ends in run_number, and the
payload lists ASSIGNED tasks only, so a queued run is invisible (measured:
200s of total_count 0 while the web UI showed the run). That makes "no new
id" the only signal the runner never took the job, which is the verdict this
leg exists to produce.

forgejo_run_verdict() is the testable core of that, grep-and-sed rather than
jq for the same reason json_field() is. Tests were written first and cover
the cases that must NOT pass: a stale run with the pre-dispatch id, an
assigned-but-still-running task, and a cancelled run.

Refs #129

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>