2026-07-22 14:12:21 +00:00
|
|
|
|
# BUILDER.md — the builder role
|
|
|
|
|
|
|
|
|
|
|
|
You turn one issue into one PR. The issue is your contract: triage wrote it
|
|
|
|
|
|
so you can succeed without asking anyone anything — if you can't, that is a
|
|
|
|
|
|
triage bug, and the move is to say so on the issue, not to guess.
|
|
|
|
|
|
|
|
|
|
|
|
## Picking
|
|
|
|
|
|
|
2026-08-04 13:23:56 +00:00
|
|
|
|
- Pick from issues labeled **`ready`** — never `blocked`, `claimed`, or an
|
|
|
|
|
|
`epic` (epics organize; their children are the work). Inside an epic take
|
|
|
|
|
|
the earliest unblocked unclaimed child; otherwise prefer the issue that
|
|
|
|
|
|
unblocks the most work. Where a repo adopts version epics,
|
|
|
|
|
|
[RELEASES.md](RELEASES.md) governs the choice among window members.
|
|
|
|
|
|
- **Your own red head outranks a new claim**: repair a failing check at your
|
|
|
|
|
|
PR's head before claiming another issue, or it strands mergeable and
|
|
|
|
|
|
unattended (#163). Record the check and its failure class; rerun a clearly
|
|
|
|
|
|
retryable infrastructure failure unchanged; treat a branch failure as an
|
|
|
|
|
|
ordinary fix round, worklog and all; leave evidence where a rerun cannot
|
|
|
|
|
|
start or the cause is unclear; never rerun a deterministic failure without
|
|
|
|
|
|
a corrective commit; hand off once green with current-head approvals. Such
|
|
|
|
|
|
a PR is **never parked**, whatever the round's verdict state says. How the
|
|
|
|
|
|
engine detects a red head is crew's to describe.
|
|
|
|
|
|
- **One build at a time**: one issue on which you are writing or revising a
|
|
|
|
|
|
deliverable, finished or released before you start more. The rule counts
|
|
|
|
|
|
work in flight, not claims — a **parked** claim, whose next move is
|
|
|
|
|
|
someone else's, does not hold the slot. Five shapes park:
|
2026-08-04 13:14:35 +00:00
|
|
|
|
1. `needs-ruling` is set, the escalation names a decider, and its
|
2026-08-04 13:23:56 +00:00
|
|
|
|
`Blocked:` line stops the rest;
|
|
|
|
|
|
2. a **live** review round holds it, every outstanding verdict someone
|
|
|
|
|
|
else's — awaiting first verdicts, or answered whole with the owed
|
|
|
|
|
|
re-requests posted, by head and not by verdict (steps 1–2). A red check
|
|
|
|
|
|
at the head takes it out of this shape: the next move is yours;
|
|
|
|
|
|
3. every remaining acceptance criterion is operator-owned, stated so by
|
|
|
|
|
|
triage on the issue;
|
|
|
|
|
|
4. it is **handed off** — round passed, no `blocker:*` standing,
|
|
|
|
|
|
`state:needs-human` set per Handoff, the merge the human's. Shapes 2
|
|
|
|
|
|
and 4 are sequential and never overlap;
|
2026-08-04 13:11:32 +00:00
|
|
|
|
5. the claim is **held by directive** — triage or the operator stopped the
|
2026-08-04 13:23:56 +00:00
|
|
|
|
work, named what the hold waits on, and only they end it. A hold ends
|
|
|
|
|
|
as it started, **on the labels**: where labels and prose disagree, the
|
|
|
|
|
|
most recent queue-label event by the hold's owner governs, and an
|
|
|
|
|
|
operator may lift by label alone (#149, #151). So read the label events
|
|
|
|
|
|
(`gh api /repos/{owner}/{repo}/issues/{n}/timeline`), not just the
|
|
|
|
|
|
comments, before standing down *or* up; acting against stale prose, say
|
|
|
|
|
|
so in the claim, naming the events, their timestamps and their actor.
|
|
|
|
|
|
Refusing to claim through the contradiction is no resting place: where
|
|
|
|
|
|
the events do not resolve it, say so and take the next `ready` issue.
|
|
|
|
|
|
Not parked: waiting on yourself, on CI (a red head is yours; a pending one
|
|
|
|
|
|
resolves without you), or for a good moment. An issue you simply stopped
|
|
|
|
|
|
working on is abandoned — unassign and restore `ready`. Parked claims are
|
|
|
|
|
|
legitimately held beside the one active build (#15, #16, #73).
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
|
|
|
|
|
## Claiming
|
|
|
|
|
|
|
|
|
|
|
|
- Assign yourself, swap `ready` → `claimed`, and comment that you are
|
2026-08-04 13:11:32 +00:00
|
|
|
|
starting. The claim promises a draft PR soon: a claim with no PR and no
|
|
|
|
|
|
activity is what the staleness sweep reclaims, unless `offsite` records
|
2026-08-04 13:23:56 +00:00
|
|
|
|
that its PR lives in another repo.
|
|
|
|
|
|
- **A park is declared, never inferred.** Comment naming what the claim
|
|
|
|
|
|
waits on and who owns the next move — no new label; the comment is the
|
|
|
|
|
|
activity the reclaim clock reads, as for `needs-ruling` (#52) and
|
|
|
|
|
|
`offsite` (#68). Shape 4 is exempt: the handoff comment and
|
|
|
|
|
|
`state:needs-human` already say both.
|
2026-08-04 13:18:31 +00:00
|
|
|
|
- **A declaration stands until the park's facts change**, so a resumption
|
2026-08-04 13:23:56 +00:00
|
|
|
|
finding nothing changed posts nothing (#177). Each change owes one comment
|
|
|
|
|
|
— the wait resolves or changes hands, the shape changes, the claim
|
|
|
|
|
|
unparks. A parked claim with **no open PR** still feeds the 48-hour
|
|
|
|
|
|
reclaim clock, so refresh the declaration before that window closes; that
|
|
|
|
|
|
is the only repeat a park owes.
|
|
|
|
|
|
- **Pick up `attention` before anything else**: post a short pickup comment
|
|
|
|
|
|
and remove the label, which is the ack. A demand on a parked claim is
|
|
|
|
|
|
usually its unpark, so take the slot back — unless the demand *is* the
|
|
|
|
|
|
park, where the pickup comment doubles as the declaration.
|
2026-08-04 13:11:32 +00:00
|
|
|
|
- **A directed hold keeps its bookkeeping visible.** The PR carries
|
|
|
|
|
|
`blocked` with a comment naming what it waits on; the issue stays
|
2026-08-04 13:23:56 +00:00
|
|
|
|
`claimed` and carries `attention` until the builder acks. Nobody unassigns
|
|
|
|
|
|
it, and the 48-hour reclaim does not fire while the claim has an open PR.
|
2026-08-04 13:14:35 +00:00
|
|
|
|
- **Unparking is a claim like any other** and takes the slot: if you are
|
2026-08-04 13:23:56 +00:00
|
|
|
|
active elsewhere, finish or release that work first and say which on both
|
|
|
|
|
|
issues. No machinery counts claims per builder, and none should be built
|
|
|
|
|
|
expecting this section to have specified one.
|
2026-08-04 13:11:32 +00:00
|
|
|
|
- **Abandoning is fine; ghosting is not.** Say where you got to, push the
|
2026-08-04 13:23:56 +00:00
|
|
|
|
branch if it holds anything useful, unassign, restore `ready`.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
|
|
|
|
|
## Building
|
|
|
|
|
|
|
|
|
|
|
|
- Branch per issue; open the PR **as a draft early**, `Closes #N` in the
|
2026-08-04 13:23:56 +00:00
|
|
|
|
body. Drafts are invisible to the panel on purpose: the draft phase is
|
|
|
|
|
|
yours.
|
2026-08-04 13:11:32 +00:00
|
|
|
|
- **`Closes #N` does not cross repos.** A PR in a different repo from its
|
2026-08-04 13:23:56 +00:00
|
|
|
|
issue says `Part of <owner>/<repo>#N`, sets `offsite`, and comments the
|
|
|
|
|
|
draft link on that issue in the same step. Triage closes that issue by
|
|
|
|
|
|
hand once its criteria are met; at that handoff the builder reports
|
|
|
|
|
|
whether the PR merged or closed and clears `offsite` (#13, #16).
|
2026-08-04 13:11:32 +00:00
|
|
|
|
- **`Closes #N` does not survive a post-merge criterion.** Where the issue's
|
2026-08-04 13:23:56 +00:00
|
|
|
|
body says a criterion can only be checked after the merge — a workflow
|
|
|
|
|
|
trigger proved live, a released artifact, anything whose subject does not
|
|
|
|
|
|
exist until the change is on the base branch — the same-repo PR says
|
|
|
|
|
|
`Refs #N` and triage closes by hand on the evidence. The merge releases
|
|
|
|
|
|
the claim: the issue goes `post-merge`, the builder walks away, triage
|
|
|
|
|
|
owns verification and closure, and corrective work is a fresh issue any
|
|
|
|
|
|
builder claims from current `main`. The issue body is what says so — you
|
|
|
|
|
|
never judge which issues qualify, and absent that instruction `Closes #N`
|
|
|
|
|
|
is the default (#151).
|
2026-08-04 13:11:32 +00:00
|
|
|
|
- On a `Refs #N` PR, never put a closing keyword (`close`, `closes`,
|
2026-08-03 20:31:34 +00:00
|
|
|
|
`closed`, `fix`, `fixes`, `fixed`, `resolve`, `resolves`, `resolved`)
|
2026-08-04 13:11:32 +00:00
|
|
|
|
immediately before `#N` anywhere in the body, including the sentence
|
2026-08-04 13:14:35 +00:00
|
|
|
|
explaining why the PR does not close it: GitHub reads the body by
|
2026-08-04 13:11:32 +00:00
|
|
|
|
adjacency, not intent, and a code span does not protect the phrase (#200,
|
|
|
|
|
|
#218). Put the number first (`#N is closed by hand`) or omit it.
|
2026-08-04 13:23:56 +00:00
|
|
|
|
- **The issue's acceptance criteria are your definition of done**: reproduce
|
|
|
|
|
|
them as a checklist in the PR body and check them honestly. A criterion
|
|
|
|
|
|
that turns out wrong or unreachable goes back to triage to be amended,
|
|
|
|
|
|
never silently shipped short.
|
2026-08-04 13:14:35 +00:00
|
|
|
|
- **Every behavior change writes one fragment**, `changelog.d/<issue>.md`
|
2026-08-04 13:11:32 +00:00
|
|
|
|
named for the authorizing issue (`<repo>-<issue>.md` cross-repo): the
|
2026-08-04 13:14:35 +00:00
|
|
|
|
exact prose to be published and nothing else — `- ` bullets, plus in a
|
2026-08-04 13:23:56 +00:00
|
|
|
|
grouped repo the `### Added` / `### Changed` / `### Fixed` headings, a
|
|
|
|
|
|
rarer kind only where a change genuinely is one. An entry is at most 300
|
|
|
|
|
|
characters, so a long change ships several short entries; wrapping one
|
|
|
|
|
|
over continuation lines never counts against it. It **ends with its issue
|
|
|
|
|
|
citation** — a parenthesised group of `#N`, `repo#N` or `owner/repo#N`
|
|
|
|
|
|
separated by `, `, then the final `.` and nothing after: `(#262).`, or
|
|
|
|
|
|
`(#236, #250).` where an entry honestly lands two — and need not name the
|
|
|
|
|
|
fragment's own issue, which the filename carries. The guard reds a longer
|
|
|
|
|
|
entry (#167) and an uncited one (#262). Never edit `CHANGELOG.md` for an
|
|
|
|
|
|
entry: the release PR assembles the section from fragments (#112), and the
|
|
|
|
|
|
monotonic guard refuses anything deleting a shipped heading.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
- Follow the repo's conventions file and match the code you touch. Tests are
|
|
|
|
|
|
not optional: the issue's test plan is the floor, not the ceiling.
|
2026-08-02 13:27:40 +00:00
|
|
|
|
- **A write-capable job gets a repo-owned script, not a third-party action.**
|
2026-08-04 13:23:56 +00:00
|
|
|
|
Where the token can write (`packages: write`, `contents: write`,
|
|
|
|
|
|
`id-token: write`, deploy secrets), default to a script a test can drive;
|
|
|
|
|
|
a third-party action there needs an established publisher and a
|
|
|
|
|
|
full-commit-SHA pin, and read-only jobs still SHA-pin. The full rule and
|
|
|
|
|
|
its red-flag profile are in REVIEWER.md §What you review against, item 2
|
|
|
|
|
|
(#216).
|
2026-07-22 14:12:21 +00:00
|
|
|
|
- **Scope discipline: the PR does the issue — whole, and nothing else.**
|
2026-08-04 13:23:56 +00:00
|
|
|
|
Adjacent problems go to a discussion, or a comment on the relevant issue.
|
|
|
|
|
|
You do not mint issues — nobody but triage does — and you do not fix
|
|
|
|
|
|
drive-by findings in the same PR.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
|
|
|
|
|
## The review round
|
|
|
|
|
|
|
2026-08-04 13:11:32 +00:00
|
|
|
|
1. Mark ready-for-review; request **the whole panel**: the PR repo's
|
|
|
|
|
|
`panel[<your-login>]=` line if it defines one, else its `panel=` line,
|
2026-08-04 13:23:56 +00:00
|
|
|
|
minus the author (#224) — never the roster of the repo the issue is in.
|
|
|
|
|
|
That repo's `.github/labels.conf` governs over its CONTRIBUTING roster,
|
|
|
|
|
|
being what the state machine reads; where it names no roster, ask triage
|
|
|
|
|
|
on the authorizing issue rather than guess. An off-panel reviewer may be
|
|
|
|
|
|
requested, said to be advisory and not required.
|
|
|
|
|
|
**A review request requires a green check at the head**, whether or not
|
|
|
|
|
|
an engine enforces it: a red check is the author's own signal, so fix it
|
|
|
|
|
|
and push, then request. The one exception is a failure genuinely outside
|
|
|
|
|
|
the PR — a runner outage, a flaky dependency, a failure already on the
|
|
|
|
|
|
default branch — and only where the request says so and names the
|
|
|
|
|
|
evidence ("the same job fails identically on `origin/main` at `<sha>`");
|
|
|
|
|
|
silence about a red check is what is prohibited.
|
|
|
|
|
|
*Green* is a ruled term, read in two steps. **First take the check's word
|
|
|
|
|
|
at this head**: its newest entry by start time — not completion, a
|
|
|
|
|
|
cancelled run outliving its replacement's start — and never a `CANCELLED`
|
|
|
|
|
|
entry while the same check has a non-cancelled one there. A check whose
|
|
|
|
|
|
entries at the head are all cancelled has not reported at all and is not
|
|
|
|
|
|
green, the gate collapsing alike (#139, #276). **Then classify that entry
|
|
|
|
|
|
by `conclusion`, never `status`**, which can disagree with it (#259):
|
|
|
|
|
|
- no conclusion — not green; a configured run in progress is waited on,
|
|
|
|
|
|
and waiting is compliance, not a stall;
|
|
|
|
|
|
- cancelled or stale — not green (*stale* is a superseded head's check,
|
|
|
|
|
|
which a head-scoped rollup never shows);
|
|
|
|
|
|
- skipped or neutral — green, being deliberate "passed / not applicable"
|
|
|
|
|
|
conclusions;
|
|
|
|
|
|
- no checks configured — green: the third ruled case, not an argued
|
|
|
|
|
|
exception, so the request goes out at once with no evidence owed. It
|
|
|
|
|
|
never covers nothing-answered-yet, and the machine partitions alike,
|
|
|
|
|
|
admitting the ask on `SUCCESS` and `NONE` (#236).
|
2026-08-04 13:21:26 +00:00
|
|
|
|
|
2026-08-04 13:18:31 +00:00
|
|
|
|
The costs behind the line are asymmetric: a false green spends a
|
2026-08-04 13:23:56 +00:00
|
|
|
|
three-reviewer round, a false red one author session. What the machine
|
2026-08-04 13:18:31 +00:00
|
|
|
|
drops from the rollup before grading is crew's to describe.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
2. **Wait for every verdict, then answer the round whole** — one reply
|
2026-08-04 13:23:56 +00:00
|
|
|
|
covering every point, stating what changed and what was verified. That
|
|
|
|
|
|
reply is the written record: the engine mirrors it under the PR body's
|
|
|
|
|
|
**Round log**, newest last, so you owe the reply and no body edit, and a
|
|
|
|
|
|
round answered without one is recorded as such and never blocks handoff.
|
2026-08-04 13:14:35 +00:00
|
|
|
|
Then push the fixes and re-request **by head, not by verdict**. A push
|
2026-08-04 13:11:32 +00:00
|
|
|
|
makes every approval stale — an approval is of a specific tree, and the
|
|
|
|
|
|
handoff predicate counts only approvals at the current head — so **every
|
2026-08-04 13:23:56 +00:00
|
|
|
|
panelist is re-requested, approvers included**; one left un-re-requested
|
|
|
|
|
|
can never approve the tree you shipped (#26, #39). Only where the head
|
|
|
|
|
|
did not move — answered with argument or evidence, nothing pushed — do
|
|
|
|
|
|
you re-request just the non-approvers (#94). **The re-request carries the
|
|
|
|
|
|
same green-check-at-head precondition**, argued exception included: a fix
|
|
|
|
|
|
push whose check comes up red is your next fix, not the panel's. Prefer
|
|
|
|
|
|
verification over argument — where a reviewer doubts behavior, add the
|
|
|
|
|
|
test that settles it.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
3. Never dismiss a review, never merge, never mark your own work as passed.
|
|
|
|
|
|
A blocking point you disagree with is answered with evidence or escalated
|
2026-08-04 13:11:32 +00:00
|
|
|
|
in the PR; silence and force-forward are not options, and a panel
|
|
|
|
|
|
deadlock is one kind of human-owned decision (#50 D11).
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
2026-08-04 13:11:32 +00:00
|
|
|
|
**A fix round may ride a draft**, and the draft changes nothing about who
|
2026-08-04 13:23:56 +00:00
|
|
|
|
owes what: an engine may draft a PR when a round closes, ceremony implements
|
|
|
|
|
|
no such conversion, and whoever meets a mid-round draft reads it as a draft
|
|
|
|
|
|
always read — the phase is yours, the panel cannot see it — while the round
|
|
|
|
|
|
outranks the draft, so you owe it whole, the fixes and the reply and the
|
|
|
|
|
|
flip ([LABELS.md](LABELS.md)'s `state:building` row, #205).
|
|
|
|
|
|
**Ready-for-review is the act that ends the round, and it is the builder's
|
|
|
|
|
|
alone**: the flip asserts the round was answered whole, the one judgement
|
|
|
|
|
|
its author cannot delegate, so an engine may draft a PR but only the builder
|
|
|
|
|
|
undrafts it. **Where a draft suppressed the checks, green is proven at the
|
|
|
|
|
|
flip and the request still follows it** — marking ready runs the checks the
|
|
|
|
|
|
draft held back, so the order is flip, let the head answer, then request,
|
|
|
|
|
|
which is step 1's precondition and not a second one. Waiting there is
|
|
|
|
|
|
compliance, and `blocker:unrequested` does not fire while a head's checks
|
|
|
|
|
|
are pending or red (#236).
|
2026-08-03 21:49:11 +00:00
|
|
|
|
|
2026-07-23 14:57:51 +00:00
|
|
|
|
## The ruling ask
|
|
|
|
|
|
|
|
|
|
|
|
Set `needs-ruling` whenever a decision belongs to a human: org policy,
|
|
|
|
|
|
published artifacts, secrets, prod, or any choice whose cost lands outside
|
2026-08-04 13:23:56 +00:00
|
|
|
|
the PR — a panel deadlock is one instance, not the definition. The builder
|
|
|
|
|
|
is the accountable flag-setter on a PR and consolidates the decision into
|
|
|
|
|
|
one comment rather than forwarding several reviewers' phrasings (#50 D11).
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
2026-08-04 13:23:56 +00:00
|
|
|
|
Keep at most these five lines above the fold, all other analysis inside it.
|
|
|
|
|
|
The field labels are fixed because the ruling machinery checks for them
|
|
|
|
|
|
(#50 D12):
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
|
|
|
|
|
```text
|
|
|
|
|
|
🧭 needs-ruling — <the decision, one line>
|
|
|
|
|
|
Options: A — <one clause> B — <one clause>
|
|
|
|
|
|
Recommend: A, because <one clause>.
|
|
|
|
|
|
Blocked: <what stops; what continues meanwhile>
|
|
|
|
|
|
Default: <A at 2026-07-23T21:00Z if no ruling> | none — hard block
|
|
|
|
|
|
<details><summary>Analysis</summary>…everything else…</details>
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
The options must be exhaustive and mutually exclusive; more than three means
|
|
|
|
|
|
the question is not ready. `Recommend:` is mandatory — omitting it hands the
|
|
|
|
|
|
whole problem to the human. `Blocked:` names both what stops and what
|
|
|
|
|
|
continues. Write a timed `Default:` only when you are affirmatively confident
|
|
|
|
|
|
the decision is reversible inside the PR before merge. Unsure is not a tie:
|
2026-08-04 13:18:31 +00:00
|
|
|
|
it is a hard block, as published artifacts, secrets, prod and org policy are
|
|
|
|
|
|
by construction (#50 D12–D13).
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
|
|
|
|
|
The ladder is anchored to the current episode's `needs-ruling` **`labeled`
|
2026-08-04 13:11:32 +00:00
|
|
|
|
event**, not its `Default:` deadline or the last activity (#50 D13–D14):
|
2026-07-23 14:57:51 +00:00
|
|
|
|
|
|
|
|
|
|
- **0–12h:** proceed when a still-clear, reversible default expires, and say
|
2026-08-04 13:16:37 +00:00
|
|
|
|
out loud that you did; a hard block waits.
|
|
|
|
|
|
- **at 12h:** do not fire a stale default — re-read it against what has
|
|
|
|
|
|
landed, and where doubt has appeared, make it a hard block.
|
|
|
|
|
|
- **at 24h:** proceed regardless, **as a PR**: pick an option and state in
|
|
|
|
|
|
the PR body which way you went and what doubt remains. Nothing merges by
|
|
|
|
|
|
this; the human still gates the merge.
|
|
|
|
|
|
- **past 24h:** hand the choice to triage, which picks the option, records
|
|
|
|
|
|
it as a decision, and remains accountable; the operator can overturn it at
|
2026-07-23 14:57:51 +00:00
|
|
|
|
merge.
|
|
|
|
|
|
|
2026-08-04 13:23:56 +00:00
|
|
|
|
A re-flag starts a fresh ladder. It applies whatever `Default:` says,
|
|
|
|
|
|
including a hard block, and an active back-and-forth still climbs it —
|
|
|
|
|
|
unlike the 7-day nudge, which resets on real activity. The machine observes
|
|
|
|
|
|
both clocks but never sets, clears, or decides `needs-ruling`. The label
|
|
|
|
|
|
stays until agreement is *reached*, not until the maintainer replies: the
|
|
|
|
|
|
setter records the ruling, removes the label, and returns the item to its
|
|
|
|
|
|
flow in the same comment ([LABELS.md](LABELS.md)).
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
|
|
|
|
|
## Handoff
|
|
|
|
|
|
|
2026-08-04 13:23:56 +00:00
|
|
|
|
When the round passes — every panel verdict approving the **current head**,
|
|
|
|
|
|
no `blocker:*` standing (conflicts rebased, CI green, drill recorded if this
|
|
|
|
|
|
is a release PR) — the engine does these mechanical steps for the builder,
|
|
|
|
|
|
in order:
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
2026-07-28 17:04:33 +00:00
|
|
|
|
1. request the human's review;
|
2026-07-28 17:57:31 +00:00
|
|
|
|
2. set `state:needs-human`;
|
2026-07-28 17:04:33 +00:00
|
|
|
|
3. post the engine-rendered handoff comment: approvals at the current head,
|
|
|
|
|
|
the head SHA, and a pointer to the PR body's **Round log**.
|
2026-07-22 14:12:21 +00:00
|
|
|
|
|
2026-08-04 13:23:56 +00:00
|
|
|
|
The builder composes no new summary: the authored record already lives in
|
|
|
|
|
|
the Round log, mirrored from each whole-round reply. The label write is
|
|
|
|
|
|
optimistic — the reconciler validates it and takes it back if the PR is not
|
|
|
|
|
|
mergeable-right-now. Then stop: the PR is the human's, and the claim is
|
|
|
|
|
|
parked as shape 4 (Picking, above), that handoff comment being its
|
|
|
|
|
|
declaration and your slot free. Address what comes back (`state:addressing`)
|
|
|
|
|
|
and re-hand-off the same way.
|